REMOVE BLOCKAGES/ MATERIAL REMOVE BLOCKAGES/ MATERIAL • . • • Business Overview - Operational Phase - At System Acceptance, Tideway will transfer above-ground assets, structures and equipment to Thames Water Tideway is responsible for Inspection of the deep tunnels and shafts, generally on a ten-yearly cycle Performing any maintenance required as a result of the inspections Maintenance costs will be funded by customers through revenue provisions in the Licence Thames Tideway Tunnel operated by Thames Water in line with the London Tideway Tunnels Operating Techniques and Environmental Permits Define parameters for filling, storage and emptying of the tunnel TUNNELS MEICA & SERVICES Maintenance and operational responsibility after the System Acceptance Date ACCESS COVERS & SHAFT METALWORK ARCHITECTURE & LANDSCAPE CULVERTS & CHAMBERS RIVER WALLS & SCOUR CSO O ODOUR & VENTILATION Maintained and owed by Tideway Maintained, operated and owned by Thames Water In the operational phase Tideway's only business is the maintenance of a gravity operated tunnel 6
View entire presentation