TATA POWER 87 93 92 88 12 55 Q2 FY23 Operational Highlights Transmission - Availability Generation - Availability I 100 99 100 98 99 98 100 99 100 28 Thermal (excl. Mundra) Mundra MO - Hydro Wind Solar 79 72 77 76 Plant Load or Capacity Utilization factor 53 46 46 44 38 38 25 26 26 28 28 30 25 23 Thermal (excl. Mundra MO - Hydro Wind Mundra) 20 20 20 20 Solar 100 Powerlinks 100 100 100 MO - 100 Transmission 100 AT&C Losses - Distribution 0.4 MO- Distribution 0.5 (0.8) TPDDL TPCODL 8.0 7.2 5.0 8.8 TPADL 8.9 6.2 Q1 FY23 ■Q2 FY23 ■Q2 FY22 TATA 35.7 23.7 30.7 16