Investor Presentaiton slide image

Investor Presentaiton

eneva Operational performance The year 2021 once again demonstrated the operational safety and integrity of our assets, with high generation dispatch due to the water crisis experienced in the period, the declaration of commerciality of Campo Gavião Belo and increases in the volume of gas reserves, attested in Certification of Reserves and Contingent Resources. At the end of the period, we had contracted installed capacity of 3.1 GW, 71% of which in "Azulão and Jaguatirica are symbols of our mission and emblematic projects, through which we offer socio-economic development for communities and safe energy." Lino Cançado, Director of operations < 53 > Installed capacity broken down by primary energy source and regulatory regime (MW) EUT Operations contracted mostly in the - Regulated Contracting Envi-ronment (ACR) Assets 2019 2020 2021 Itaqui 360 360 360 Coal Pecém II 365 365 365 Parnaíba | TPP 676 676 676 Parnaíba II TPP 519 519 519 Parnaíba III TPP 178 178 178 Parnaíba V TPP (Non-operational) 385 385 385 Parnaíba VI TPP (Non-operational) 92 92 92 Jaguatirica II TPP (Non-operational) Azulão TPP (Non-operational) 141 141 141 295 Total 2,716 2,716 3,011 Assets 2019 2020 2021 Gas operation. Gross energy generation in the regulated market was 10,633,488 MWh, 51.13% more than in 2020. Since our creation, mainly due to the scenario of a decline in hydroelectric generation, with the worst drought in 91 years, according to the National Electric System Operator (ONS), we have recorded a record in energy generation. The average dispatch of our gas-fired thermoelectric generation assets was 77% and, in coal plants, 64%, which represents an average consolidated dispatch of 72%. Operations contracted mostly in the Free Contracting Environ-ment (ACL) Gas Renewables Total sustainability report 2021 Parnaíba IV TPP 56 56 56 Tauá 1 1 1 57 57 57 manufactured capital
View entire presentation