Investor Presentaiton
eneva
Operational
performance
The year 2021 once again demonstrated the
operational safety and integrity of our assets,
with high generation dispatch due to the water
crisis experienced in the period, the declaration
of commerciality of Campo Gavião Belo and
increases in the volume of gas reserves, attested in
Certification of Reserves and Contingent Resources.
At the end of the period, we had contracted
installed capacity of 3.1 GW, 71% of which in
"Azulão and Jaguatirica are symbols of our mission and
emblematic projects, through which we offer socio-economic
development for communities and safe energy."
Lino Cançado, Director of operations
< 53 >
Installed capacity broken down by primary energy source and regulatory regime (MW) EUT
Operations contracted mostly in the - Regulated
Contracting Envi-ronment (ACR)
Assets
2019
2020
2021
Itaqui
360
360
360
Coal
Pecém II
365
365
365
Parnaíba | TPP
676
676
676
Parnaíba II TPP
519
519
519
Parnaíba III TPP
178
178
178
Parnaíba V TPP (Non-operational)
385
385
385
Parnaíba VI TPP (Non-operational)
92
92
92
Jaguatirica II TPP (Non-operational)
Azulão TPP (Non-operational)
141
141
141
295
Total
2,716
2,716
3,011
Assets
2019
2020
2021
Gas
operation. Gross energy generation in the regulated
market was 10,633,488 MWh, 51.13% more than in
2020.
Since our creation, mainly due to the scenario of a
decline in hydroelectric generation, with the worst
drought in 91 years, according to the National
Electric System Operator (ONS), we have recorded a
record in energy generation. The average dispatch
of our gas-fired thermoelectric generation assets
was 77% and, in coal plants, 64%, which represents
an average consolidated dispatch of 72%.
Operations contracted mostly in the
Free Contracting Environ-ment (ACL)
Gas
Renewables
Total
sustainability report 2021
Parnaíba IV TPP
56
56
56
Tauá
1
1
1
57
57
57
manufactured capitalView entire presentation