Investor Presentaiton
S
RL (metres)
400-
300-
200-
100-
900 N
1000 N
SRC061
7m from 134m @ 0.13% Co
SRCD059
2.9m from 168.1m @ 0.33% Co
SRCD07
SRC060
9m from 111m @ 0.23% Co
60m from 191m @ 0.1% Co
SND6
6.18m from 210.6m @0.08% Co
SRCD030
16m from 208m @ 0.11% Co
incl. 2m @ 0.31% Co and
3m @ 0.28% Co
SRCD07
21m from 289m @ 0.13% Co
SRCD028A
9m from 270m @ 0.13% Co
ASRD003
21.22m from 345.7m @0.07% Co
SND6
SND9A
SRCD07
SRCD11B
ASRD002A
1100 N
ASRD004
SRCD03
ASRD005
1200 N
Surface
SRCD031
35m from 100m @ 0.12% Co
incl. 3m @ 0.18% Co
SRCD03
18.4m from 108.6m @0.07% Co
SRC061
7m from 134m @ 0.13% Co
SND9A
8.87m from 156.13m @ 0.14% Co
SRCD063
6m from 291m @ 0.10% Co
SRCD064
14.5m from 394m @ 0.34% Co
incl. 9.6m @0.49% Co and
3m @ 0.96% Co
ASRD004
11m from 395m @ 0.3% Co
ASRD005
7.85m from 455m @0.04% Co
0-
ASRD002A
8.6m from 475.6m @ 0.11% Co
SRCD11B
8m from 468m @0.04% Co
LEGEND
Drill hole with Co intersection
- new AKN hole or new assay of
previous hole
Drill hole with Co intersection
- previous hole
-100-
0
50
100m
Zone of mineralisation
Surface drillhole collar & trace
Pierce point drill hole trace
AUKING
SANDIEGO PROSPECT
DRILL HOLE LONG SECTION
-1000E, (COBALT)
1300 N
N
RL (metres)
-400
-300
-200
-100
-100
KOONGIE PARK PROJECT
SANDIEGO DEPOSIT
PROSPECTIVE FOR COBALT
•
Further assessment of cobalt mineralisation.
•
•
Significant zones of cobalt mineralisation across the
Sandiego deposit - based on drilling last year and
historic results. Highlighted by drillhole SRCD0064 -
14.5m@ 0.34% Co (including 9.6m@ 0.49% Co and
3m@ 0.96% Co)
Cobalt was not assayed in drilling programs prior to
2010. Remnant core samples re-assayed from pre-
2010 programs.
Cobalt mineralisation was identified in all eight drill
holes that were sampled.
Cobalt mineralisation is not currently included in
the latest Koongie Park resource estimate.
Refer ASX release dated 26 April 2022
9
AUKING
AKNView entire presentation