Investor Presentaiton slide image

Investor Presentaiton

Renewable capacity as of 31 March 2023 Indicator, MW, gross Installed renewable capacity Offshore, wind power Onshore - Wind power -Solar PV power - Battery storage Q1 2023 Q1 2022 A FY 2022 15,478 13,275 2,203 15,121 8,871 7,551 1,320 8,871 4,532 3,649 883 3,464 2,952 512 1,028 657 371 4,175 3,464 671 40 40 Other (incl. P2X) 2,075 2,075 - Biomass, thermal heat 2,054 2,054 40 2,075 2,054 - Battery storage 21 21 21 Decided (FID) renewable capacity 4,903 4,573 330 4,340 Offshore, wind power 3,116 3,516 (400) 2,196 Onshore 1,715 1,055 660 2,072 - Onshore wind power 321 375 (54) 321 -Solar PV power 1,094 680 414 1,451 - Battery storage 300 300 300 Other (incl. P2X) 72 2 70 72 Awarded/contracted renewable capacity (no FID yet) 10,562 8,305 2,257 11,222 Offshore, wind power 10,337 8,305 Onshore, solar PV power 225 Sum of installed and FID capacity 20,381 17,848 Sum of installed, FID, and awarded/contracted capacity 30,943 26,153 2,032 225 2,533 4,790 11,157 65 19,461 30,683 15 Installed renewable capacity The installed renewable capacity is calculated as the cumulative renewable gross capacity installed by Ørsted before divestments. For installed renewable thermal capacity, we use the heat capacity, as heat is the primary outcome of thermal energy generation, and as bioconversions of the combined heat and power plants are driven by heat contracts. Decided (FID) renewable capacity Decided (FID) capacity is the renewable capacity for which a final investment decision (FID) has been made. Awarded and contracted renewable capacity The awarded renewable capacity is based on the capacities which have been awarded to Ørsted in auctions and tenders. The contracted capacity is the capacity for which Ørsted has signed a contract or power purchase agreement (PPA) concerning a new renewable energy plant. Typically, offshore wind farms are awarded, whereas onshore wind farms are contracted. We include the full capacity if more than 50% of PPAs/offtake are secured. Installed storage capacity The battery storage capacity is included after commercial operation date (COD) has been achieved. The capacity is presented as megawatts of alternating current (MW ac). Note: In Q4 2021, we aligned our definition of installed capacity, hence all assets (installed or FID'ed) are reported using nameplate capacity. Previously a few wind farms were reported using 'power optimised capacity' or 'export cable limit capacity' Orsted
View entire presentation