Reduction of energy consumption |G4-EN6|
Unit
Project title
Gavião Peixoto
Modernization of the hangar illumination system - G-1340
Modernization of the hangar illumination system - G-1560
Modernization of the hangar illumination system - G-1350
Modernization of the hangar illumination system - G-1360
Modernization of the hangar illumination system - G-1362
Modernization of the hangar illumination system - G-1550
Installation of photovoltaic panels
Patio F 51/57
Economy in the year (kWh)
173,184.00
69,264.00
221,400.00
173,952.00
112,788.00
Total of water removed by source |G4-EN8|
Water sources
Underground water
Effluent from other organizations
Quantity (m³)
2014
647,616
2015
2016
616,545
563,845
60,315
Municipal supply of water or other water supplying companies
Total volume of removed water
115,737
344,268
503,066
763,353
960,813
1,127,226
304,920.00
3,352.00
5,280.00
Faria Lima
Patio F 231
LED lighting F-30/2
Hangar F30/1
35,868.00
75,200.00
41,040.00
LED lighting - F-51/57
15,010.00
LED lighting external (layout)
136,800.00
The SJK, EGM and GPX sites are supplied with underground water captured in the area of the company. The ELEB,
Taubaté, Botucatu, Belo Horizonte and Sorocaba sites in Brazil and the Évora, OGMA, Fort Lauderdale, Nashville,
Melbourne and Beijing sites abroad use municipally supplied water or other water supplying companies. As of
2016, we began to report the volume of effluent treated for reuse from the water company of the municipality of
Melbourne. The Harbin unit ceased operations at the start of 2016 and information referring to this unit is not
included in the report. Values reported were obtained using direct measurements.
Water sources significantly effected by removal of water | G4-EN9|
We add that there are no sources significantly effected by our operations.
LED lighting - F-101
26,400.00
LED lighting - F-113
LED lighting - F-77
116,160.00
80,256.00
LED lighting - F-50
LED lighting - F-66
60,192.00
170,544.00
Site
Eugênio de Melo
LED lighting - E-501
394,896.00
LED lighting external areas - layout
31,200.00
SJK
Replacement of tubular fluorescent lights with LED lights -
EGM
Total percentage and volume of recycled and reused water | G4-EN10|
2016
Total of recycled and
reused water (m³)
5,280
0
Percentage of
Total of used water (m³)
recycled water
362,813
1
143,113
0
9,348.00
Botucatu
B01 and B12
TTE
26,464
7,454
28
Installation of photovoltaic lighting posts
6,480.00
ELEB
56,106
29,952
53
Project of compressed gas economy
Total
235,247
2,498,780.61
GPX
69,000
5,801
8
BOT
89,316
0
0
EVO
82,617
1,800
2
FLL
29,560
0
0
For lighting projects, the avoided consumption was estimated using the old and new lighting powers and the
operational time in each hangar where the exchange took place.
BNA
1,980
0
0
MLB
71,283
0
0
For the photovoltaic energy generation project the avoided energy was estimated based on the power of installed
photovoltaic panels and the solar incidence in the region.
For the compressed gas economy project in Botucatu, gas economy was estimated based on energy used before
and after implementation thereof, in which habit changes were encouraged, such as turning off compressors in
the early morning and on weekends.
BJS
2,213
0
0
BHZ
4,760
0
0
OGMA
239,078
2,840
1
SOD
2,050
0
0
Embraer Brasil
753,622
48,487
6
Embraer S.A.
1,180,353
53,127
5
52