Investor Presentaiton slide image

Investor Presentaiton

Reduction of energy consumption |G4-EN6| Unit Project title Gavião Peixoto Modernization of the hangar illumination system - G-1340 Modernization of the hangar illumination system - G-1560 Modernization of the hangar illumination system - G-1350 Modernization of the hangar illumination system - G-1360 Modernization of the hangar illumination system - G-1362 Modernization of the hangar illumination system - G-1550 Installation of photovoltaic panels Patio F 51/57 Economy in the year (kWh) 173,184.00 69,264.00 221,400.00 173,952.00 112,788.00 Total of water removed by source |G4-EN8| Water sources Underground water Effluent from other organizations Quantity (m³) 2014 647,616 2015 2016 616,545 563,845 60,315 Municipal supply of water or other water supplying companies Total volume of removed water 115,737 344,268 503,066 763,353 960,813 1,127,226 304,920.00 3,352.00 5,280.00 Faria Lima Patio F 231 LED lighting F-30/2 Hangar F30/1 35,868.00 75,200.00 41,040.00 LED lighting - F-51/57 15,010.00 LED lighting external (layout) 136,800.00 The SJK, EGM and GPX sites are supplied with underground water captured in the area of the company. The ELEB, Taubaté, Botucatu, Belo Horizonte and Sorocaba sites in Brazil and the Évora, OGMA, Fort Lauderdale, Nashville, Melbourne and Beijing sites abroad use municipally supplied water or other water supplying companies. As of 2016, we began to report the volume of effluent treated for reuse from the water company of the municipality of Melbourne. The Harbin unit ceased operations at the start of 2016 and information referring to this unit is not included in the report. Values reported were obtained using direct measurements. Water sources significantly effected by removal of water | G4-EN9| We add that there are no sources significantly effected by our operations. LED lighting - F-101 26,400.00 LED lighting - F-113 LED lighting - F-77 116,160.00 80,256.00 LED lighting - F-50 LED lighting - F-66 60,192.00 170,544.00 Site Eugênio de Melo LED lighting - E-501 394,896.00 LED lighting external areas - layout 31,200.00 SJK Replacement of tubular fluorescent lights with LED lights - EGM Total percentage and volume of recycled and reused water | G4-EN10| 2016 Total of recycled and reused water (m³) 5,280 0 Percentage of Total of used water (m³) recycled water 362,813 1 143,113 0 9,348.00 Botucatu B01 and B12 TTE 26,464 7,454 28 Installation of photovoltaic lighting posts 6,480.00 ELEB 56,106 29,952 53 Project of compressed gas economy Total 235,247 2,498,780.61 GPX 69,000 5,801 8 BOT 89,316 0 0 EVO 82,617 1,800 2 FLL 29,560 0 0 For lighting projects, the avoided consumption was estimated using the old and new lighting powers and the operational time in each hangar where the exchange took place. BNA 1,980 0 0 MLB 71,283 0 0 For the photovoltaic energy generation project the avoided energy was estimated based on the power of installed photovoltaic panels and the solar incidence in the region. For the compressed gas economy project in Botucatu, gas economy was estimated based on energy used before and after implementation thereof, in which habit changes were encouraged, such as turning off compressors in the early morning and on weekends. BJS 2,213 0 0 BHZ 4,760 0 0 OGMA 239,078 2,840 1 SOD 2,050 0 0 Embraer Brasil 753,622 48,487 6 Embraer S.A. 1,180,353 53,127 5 52 53
View entire presentation