NHPC - Projects in Operation... contd. Renewable Energy एनएचपीसी NHPC 24 S.No Project (MW) Installed Design Capacity Energy (MU) Capital Cost Year of Comm. as on 31.03.2020 Tariff 19-20 (Rs./unit) Place of Project Wind Power 50 94.25 2016 330.40 3.67 Lakhmana, Jaisalmer 2 Solar Power 50 105.96 2018 290.59 4.41 Theni/Dindigul District, Tamilnadu Total-B 100 200.21 620.99 Sub Total Stand-alone(A+B) 5551 24874.35 40217.18 3.36 Operational Projects with Subsidiary Installed Design S.No Project Capacity Energy Year of Comm. Capital Cost Tariff 18-19 (Rs./kwh)* Type of the project (MW) (MU) 1 Indrasagar, (8x125) 1000 1442.70 2005 4865.09 3.71 Storage Madhya Pradesh 2 Omkareshwar, 520 677.47 2007 3152.66 5.96 Storage (8x65) Madhya Pradesh Total-C 1520 2120.17 8017.75 * Tariff for 2019-20 yet to be notified. Grand Total- 7071 26994.52 D:(A+B+C)