Water and Wastewater Treatment Solutions
MABR Technology Validated by Industry Experts
Black & Veatch independently validated the upgrade goals of the Mayan Zvi SUBRE installation were met and increased
capacity achieved
What have we learned about the MABR?
Fundamental
Understanding
• Microbial
Community
Structure
AOB/NOB ratio
Operational
Challenges
• Optimal SRT
Impact of C:N ratio
• Resilience
• Robustness
• Quorum sensing
• Biofilm
Management
Scale up
Challenges
•No of membranes
• Nitrification rate
Key remaining research questions are site specific and related to whole system
integration
Mayan Zvi Total Nitrogen Reduction - Past 3 months
27 R
MZ upgrade actions map
SUBRE is just a small section
That binds with many others!!
·
1. Pre-treatment
Combined pretreatment machines with 1.5 mm fine
screen
10 mm coarse screen
Electricity and Electrical room
Odor prevention
2. Distribution cell - modification
Change hydraulic profile
3. SUBRE Retrofit Phase I-2019
Cleaning
Coarse bubble diffusers
11 SUBRE modules
Process blowers
Local electrical and control cabinet
Condensate pumps
4. Aerobic chamber - maintenance
Cleaning
Concrete cracks fix
Fine diffusers replace
Failures fix
5. Sludge holding tank - converting to a temporary
biological treatment
Cleaning
WW rerouting pipes
Mobile aeration system
6. Main Electrical and control room
Add SUBRE main E&C cabinet
Overall new plant control SW
Plant control calibration with SUBRE
7. New temporary Sludge holding pool
8. Septic trucks discharge station
9. SUBRE phase II -2022
70
50
40
30
10
0
222°
TN Concentration [mg/l]
3/25
4/4
Raw
4/14
4/24
-Anaerobic
fluence
5/14
5/24
SUBRE
-Seconday Effluent
6/3
PARAMETER
WWTP DESIGN
UPGRADE - BASED
ON MEASURED
CONDITIONS
UPGRADE
INCREASED
CAPACITY - BASED
LARGER VALUE
92%
COD
TSS
8,500 kg/d
3,492 kg/d
16,312 kg/d
8,755 kg/d
151%
TKN
540 kg/d
706 kg/d
31%