Water and Wastewater Treatment Solutions slide image

Water and Wastewater Treatment Solutions

MABR Technology Validated by Industry Experts Black & Veatch independently validated the upgrade goals of the Mayan Zvi SUBRE installation were met and increased capacity achieved What have we learned about the MABR? Fundamental Understanding • Microbial Community Structure AOB/NOB ratio Operational Challenges • Optimal SRT Impact of C:N ratio • Resilience • Robustness • Quorum sensing • Biofilm Management Scale up Challenges •No of membranes • Nitrification rate Key remaining research questions are site specific and related to whole system integration Mayan Zvi Total Nitrogen Reduction - Past 3 months 27 R MZ upgrade actions map SUBRE is just a small section That binds with many others!! · 1. Pre-treatment Combined pretreatment machines with 1.5 mm fine screen 10 mm coarse screen Electricity and Electrical room Odor prevention 2. Distribution cell - modification Change hydraulic profile 3. SUBRE Retrofit Phase I-2019 Cleaning Coarse bubble diffusers 11 SUBRE modules Process blowers Local electrical and control cabinet Condensate pumps 4. Aerobic chamber - maintenance Cleaning Concrete cracks fix Fine diffusers replace Failures fix 5. Sludge holding tank - converting to a temporary biological treatment Cleaning WW rerouting pipes Mobile aeration system 6. Main Electrical and control room Add SUBRE main E&C cabinet Overall new plant control SW Plant control calibration with SUBRE 7. New temporary Sludge holding pool 8. Septic trucks discharge station 9. SUBRE phase II -2022 70 50 40 30 10 0 222° TN Concentration [mg/l] 3/25 4/4 Raw 4/14 4/24 -Anaerobic fluence 5/14 5/24 SUBRE -Seconday Effluent 6/3 PARAMETER WWTP DESIGN UPGRADE - BASED ON MEASURED CONDITIONS UPGRADE INCREASED CAPACITY - BASED LARGER VALUE 92% COD TSS 8,500 kg/d 3,492 kg/d 16,312 kg/d 8,755 kg/d 151% TKN 540 kg/d 706 kg/d 31% 30
View entire presentation