Investor Presentaiton
ACQUIRED ASSET POTENTIAL
PPL 207, Worrior Field (30% interest) provides
proven, South Australian production:
◉
Cumulative production of 4.09 MMbbl (100% JV)
-
Current JV production of ~40 bopd – Field production
increase to >100 bopd with JV approved zone change
0.18 MMbbl remaining 2P reserves JV share
Murta and Patchawarra flank provide appraisal upside
◉
Experienced operator in Beach Energy Ltd
130 4
-2624
PEL 93 (30%)
PPL 207 (30%)
Cooper 61
130-47
Worrior-10
Worrior-3
Pando-1
Worrior-5
●Worrior-2
Worrior-7
Worror-4
Worrior-8
Worror-1
Warrior-g
Worrior-8
Worrior-11
0
kilometre
*
Cooper Energy tenement
Ol and gas well
Of well
Dry well with oil show
Dry well with gas show
Pando-2
Seismic line
130-50
Growth potential from 670kbbls Contingent
Resources (JV share) in Murta/McKinlay/Birkead
zones - within tieback distance to Worrior
Ex PEL 93 and PEL 100 provides a number of
exploration targets in the proven Western Flank
acreage, whilst Ex PEL 110 provides northerly
fairway upside
July 2021
Worrior field depth structure map
Worrior Field
Developed reservoirs*
Total developed OOIP (MMBBL)
Undeveloped reservoirs (#)
OOIP Volumes (MMBBL)
McKinlay
4.80
Birkhead
5.90
Hutton
0.60
Patchwarra (W-10)
0.70
12.00
Murta
Patchawarra
2.70
1.50
16.20
Total developed & undeveloped OOIP (MMBBL)
Opportunity
Tyrell
Flint
Permit
Chance of
Success
Mean
Recoverable
Secondary
Targets
(MMbbls)
(%)
PRL 232
2.3
25.9
Murta
PRL 233
1.7
25.9
Murta
11View entire presentation