Investor Presentaiton slide image

Investor Presentaiton

Climate Change Water Security Waste IV Sustainability: FY21 Performance Key Highlights • • • • Steam turbine modernization in 300MW units at Vijayanagar Replacement of Condenser tubes with graphene coating at Vijayanagar Commissioned 1.06 MWp Solar Plant at Sherpa Camp at Hydro plant Sustainability Committee formed for low carbon strategy Operate Cooling tower with higher Cycles Of Concentration with modified chemical regime • Operate Existing Effluent recycle plant with 100% utilization • Efficient Utilization of rainwater for plant & township use . Effective utilisation of 100% of fly ash generated Fly ash supplied to Cement & Brick industries • Calibration of Low NOx burners at Vijayanagar Air • Use of low Sulphur coal at Ratnagiri Emissions Modification of ESP resulting in reduction of Dust at Barmer Biodiversity JSW Energy Investor Presentation Plantation of local species by cultivating in own nursery at Ratnagiri Two local NGOs engaged for restoration and protection of habitats at Barmer Watershed area taken under development of Silvi-pasture plantation at Barmer JSW Energy Performance Scope 1 emissions ('000 tCO2e) CO2 intensity (tCO2e/MWh) 0.76 17,201 0.68 14,481 FY20 FY21 FY20 FY21 Ash Utilisation (%) PM Emissions (kg/MWh) 0.16 100 100 0.14 FY20 FY21 FY20 FY21 SOx Emissions (kg/MWh) 1.78 NOx Emissions (kg/MWh) 1.01 1.65 0.95 FY20 FY21 FY20 FY21 40
View entire presentation