Opportunities in Clean Technology
The fossil-dominated energy consumption structure has posed severe challenges, such as environmental pollution
and climate change. Clean energy plays a crucial role in the current energy transition. To actively participate in the
energy transformation, we are building a photovoltaic roof project in Uxin Smart Used Vehicle Inspection and
Reconditioning Plant in Hefei. Using cleaner energy has become part of our commitment to contribute to the
sustainable development goal and the zero-carbon future.
With a total investment of RMB 2.5 billion and a total planned construction area of about 470,000 m², the Uxin Used
Vehicle Inspection and Reconditioning Plant, located in Changfeng County of Hefei City, Anhui Province, is expect-
ed to be the world's largest and most advanced used vehicle re-manufacturing plant. A distributed photovoltaic
power project will be set up on the roofs of the buildings at the inspection and reconditioning center in the plant.
The total available roof area is about 80,000 m² with a utilization rate of up to 70%.
The project is now under construction and is expected to be completed by the end of December 2023. This plant
will greatly enhance the development of the upstream and downstream industries of automobile and related
service industries in the region. It will also promote the use of renewable energy and reduce carbon emissions to
help achieve sustainable economic and social development targets as well as the national carbon peaking and
carbon neutrality goals.
Key Performance
Once the photovoltaic project is completed, its installed capacity is estimated to reach about 8 MW, with annual
power generation of 8,000,000 kWh, saving 2,560 tons of standard coal and reducing emissions of
6,707 tons of carbon dioxide and 2,176 tons of dust.