Houston Flagship Deposit Development Plan slide image

Houston Flagship Deposit Development Plan

LIM H2-2012 Operating Results Quarter Ended September 30, 2012 Six Months Ended September 30, 20121 (all tonnes are dry metric tonnes) Total Ore Mined Tonnes Grade (% Fe) Tonnes Grade (% Fe) 961,700 60.8 1,629,900 61.5 Direct Rail Ore portion 569,800 62.4 1,053,200 62.5 Waste Mined 1,533,200 2,902,600 Ore Processed and Screened 643,700 58.2 771,100 57.8 Lump Ore Produced 62,900 60.5 80,600 60.4 Sinter Fines Produced 508,800 61.1 543,500 61.4 Total Product Railed 706,500 62.2 1,238,800 62.4 Tonnes Product Sold 647,600 62.3 1,134,100 62.7 Port Product Inventory 282,300 62.1 282,300 62.1 Site Product Inventory 89,900 60.2 89,900 60.2 Site Run-of-Mine Ore inventory 432,100 56.2 432.100 56.2 Note: tonnage figures in table rounded Labrador Iron Mines - TSX: LIM LIM 9 39
View entire presentation