Phoenix Feasibility Study 2023
Denison Mines
Phoenix ISR Freeze Wall:
Isometric View at Ore Level
Unconformity
C
Phase 5
Phoenix
Zone B
Phoenix
Zone A
Phase 1
Phase 2
Phase 3
Phase 4
D
N
Phoenix
Zone B2
Phoenix
Zone B1
750 m
Notes:
Isometric view centered at 400 m depth below ground surface (ore level)
• Window 35 m above and below the ore zone level
⚫Frozen cross walls are thawed as freeze wall expands to accommodate
subsequent phases
Robust mine
Freeze Wall
(No planning
process
evaluation of
production
potential for
individual well
patterns: 74
extraction, 172
injection, and 22
monitoring
wells
Mineralized Zone
Footprint
MINING PHASE 1
MINING PHASE 2
Freeze Wall
Mineralized Zone
Footprint
(No Flow Boundary)
MINING PHASE 3
Extraction Well
Injection Well (large diameter)
Injection Well (narrow diameter)
Injection Well (exploration borehole)
N637 4500
N6375000
N
27
N04000
(28)
N6323500
7.2
(7.3)
38)
16
26
LEGEND:
FREEZE WALL OUTLINE
NEW SITE FEATURE
FUTURE
10
120m
SHORELINE
540
CONTOUR
ORE BODY
FEATURE ITEM NO.
20
-124
(12)
$2
125
17
10:
(103)
10.1
Environmental
disturbance
limited by
compact site
Primary site facilities
contained within area
estimated to be less
than 1 sq. km
(31)
(25)
Om
100
200
300
400
500
1:10000
Item
Description
1
ISR Well Field
2
Freeze Plant
3
ISR Plant
4
Contaminated Runoff Pond and Pumphouse
5
Process Precipitates Solids Pad
6.1
Gypsum Waste Pond
6.2
Gypsum Waste Pond (Future)
7.1
Industrial Landfill
7.2
Industrial Leachate Collection Pond
7.3
Industrial Landfill (Future)
8
Special Waste Pad
9.1
Clean Waste Pad
9.2
Clean Waste Runoff Pond
Effluent Monitoring and Release Pond and
Pumphouse
10.1
Effluent Monitoring and Release Pond
Effluent Monitoring and Release Pond
Lenison
Phoenix
Feasibility
Study:
Expected to
provide an
excellent
basis to
advance
engineering
designs in
support of a
future final
investment
decision
10.2
10.3
11
Process Water Pond and Pumphouse
12
Industrial Waste Water Treatment Plant
13
Wash Bay/Scanning Facility
14
Propane Storage (1 Camp, 1 Mill)
15
Potable Water Plant
16
Camp
17
Standby Diesel Generator (2)
18
138kV Substation Yard
N
ROAD ALIGNMENT ADJUSTMENT
AIRPORT
CHANNEL
CROSSING
APRON
19
Operations Centre, Gate House
20
Plant Support Facilities
21
Covered Storage
22
Fenced Storage
23
Hazardous Storage Short Term Storage Pad
RUNWAY
24
Potable Water Tank and Pumphouse
(41)
25
Fire Water Tank and Pumphouse
26
Fuel Storage
27
Monitoring Wells
28
Fresh Water Wells (Quantity of 2)
29
(Intentionally Blank)
30
Lake Water Intake
THIS DRAWING
31
Lake Water Discharge
32
UBS Settling Pond
PROPOSED ACCESS
(34)
33
OVERHEAD ROAD TO SITE
POWER
LINE
(33)
EXISTING
OVERHEAD
POWER LINE
HWY 914
34
35
Domestic Wastewater Treatment Facility
36
(Intentionally Blank)
37
Main Electrical Switch room
38
Diesel Fuel Storage Tank
39
SaskPower 138kV Overhead Power Line
40
Transformers (2)
41
Airport (See Key Plan)
KEY PLAN
42
Communication Tower
Domestic Landfill (See Key Plan)
Construction Waste Laydown Area (See Key Plan)
NOTES:
(1) Refer to the Wheeler
River Technical Report
titled "NI 43-101 Technical
Report on the Wheeler
River Project, Athabasca
Basin, Saskatchewan, Can
ada" dated June
23, 2023.
12View entire presentation