NHPC Renewable Energy and Pump Storage Project Updates slide image

NHPC Renewable Energy and Pump Storage Project Updates

Incentives Position Comparative Incentive YoY (in Crs.) 11 एनएचपीसी NHPC SI. Particulars FY23-24 FY22-23 Q-1 Q-2 Q-3 Q-4 Total Q-1 Q-2 Q-3 Q-4 Total 1 Secondary 0.00 0.00 0.00 0.00 13.61 109.65 123.26 Energy 2 Incentives 0.00 0.00 171.44 181.22 2 92.15 (39.65) 405.16 3 Deviation 11.51 11.51 72.14 47.25 29.20 (2.09) 146.50 Chrgs. G. Total 11.51 11.51 4 PAF 94.13% 243.58 228.47 134.96 94.13% 98.57% 99.87% 88.25% 67.91 67.96% 88.75% 674.92 Supplements Supplements Power Station With Highest PAF: Salal (PAF: 105.49%, NAPAF: 64%) Power Station with highest Deviation Charges: Dulhastil (Rs. 2 Cr.) Power Station Giving Best Generation: Chamera-1 (48% of the annual design energy) Power Station with Highest PBT- Dulhasti (Rs. 192 Crs) NHPC Profit per MW: Rs. 19 lakhs (Q1 FY'24), Rs. 19 lakhs (Q1 FY'23) per Employee: Rs. 22 lakhs (Q1 NHPC Profit per Employee: Rs. 22 lakhs (Q1 FY'24), Rs. 21 lakhs Rs. 21 la (Q1 FY'23)