2021 Work Programs slide image

2021 Work Programs

Ikutahara Project Ryuo Prospect: drilling in progress 699,800 m NOTE 700.000-E Ryuo Mine Prospect Alteration Map 0 meters 200 N 4.873.200 4873.000 300 0.54 BURYU +0.88 609.800 m 0.83 RYUEI 700,000-E 250 700 200 mE 0.71 200 JINJA 3.39 700,400 E 700500 m 2.87 7250 IKDD21-003 5.91 3.47 3.41 7.12 3.64 2.22 1.44 IKDD21-001 0.62 0.52 0.62 2.7 0.68 0.71 700 200 m 0.88 TAISEI 0.75 JAPAN GOLD 4873,600 mN 4873.400 m SHOUEI IKDD21-002 Rock-Chip Au (git) FT OC <- ≥5 <>2 to 5 4.873.200 mN 4.873.000 m 4872 800 mN 0.5 to 2 0.1 to 0.5 LEGEND Quartz vein outcrop Silicified hydrothermal breccia outcrop/float Silicified rhyolitic volcaniclastic rocks Argillised rhyolitic volcaniclastic rocks Rhyolite and sandstone (weakly altered) Mine dumps Unpaved logging road Gravel paved road River Underground workings Initial drill holes Permitted drill pads 700 400 mE 700 600 m 4.872.600 mN JAPAN GOLD CORP. TSXV: JG | OTCQB: JGLDF Historic Ryuo Mine, alteration map with historic workings, planned drill holes, permitted drill pads and gold in rock chip values 32
View entire presentation