Investor Presentaiton
Simberi PNG-PFS preliminary results
Scope
Ore Reserves
at 30 June 2015¹
Capex
Production
Mill throughput
Recovery
Output
All-In Sustaining Cost³
Produce and sell gold concentrate from sulphide ore and
gold doré from oxide ore
Sulphide: 19.9 Mt @ 2.0 g/t Au for 1,285 koz of contained gold
Oxide: 19.1 Mt @ 1.3 g/t Au for 818 koz of contained gold²
US$100 million (A$140 million at A$/US$ 0.70) comprising:
US$43 million processing plant
US$42 million mining fleet (consider alternative)
US$15 million general site infrastructure
St Barbara
LIMITED
Sulphide average annual production c. 140,000 ounces over 7 years
-
(1 Moz in total)
Oxide annual production within the Project varies (140,000 oz in total)
2.0 Mtpa
c. 83%
Gold concentrate @ 30+ g/t Au from sulphide ores
Gold doré from oxide ores
US$930 to US$990 per ounce
The above project metrics are based on a progress report on the PFS and subject to the assumptions contained therein. The results may change as the PFS is finalised.
It is envisaged that further optimisation and value engineering activities will continue on the Project during the strategic review.
1. Refer ASX release 25 August 2015 'Ore Reserves and Mineral Resources Statements as at 30 June 2015'
2.
Parts of the existing oxide reserve are contained within the Sulphide Project pit shell, and are subject
to optimisation of the existing oxide operation
24 Asia Investor Relations Roadshow / March 2016
3. Non-IFRS measure, refer corresponding slide in AppendixView entire presentation