Investor Presentaiton slide image

Investor Presentaiton

NHPC - Projects Under Construction CCEA एनएचपीसी NHPC Installed Design Estimated Anticipated NHPC Project Capacity Energy Type of the project (MW) (MU) Cost (Rs. Crore) (Price Project Cost (Rs. Crore) Level) TLDP IV (40x4) West 160 720 Run of River 1061.38 1929.15 * 1 Provisional Project Expenditure till -Dec'14 (Rs. Crore) 1606.79 Expected Commissioning Schedule FY 16-17 (Q-2) Bengal with small (MAR05) (AUG13) pondage Subansiri Lower 2000 7421 Reservoir 6285.33 15300.00 *27057.12 It shall be (250X8) Assam/ Ar. (DEC02) (JAN14) Pradesh finalized after resumption of works Parbati II (200x4) 800 3108.66 Run of River 3919.59 5365.70 4789.81 FY 18-19 (Q-4) Himachal Pradesh with small (DEC01) (AUG11) pondage Kishanganga (110x3) Jammu & Kashmir 330 1350 Run of River 3642.06 5497.72 3799.79 FY 16-17 (Q-3) with small pondage (SEP07) (JUL13) Total-A 3290 12599.66 14908.36 28092.57 17253.51 In case of Sub Lower1527.79 crs charged to P&L and in case of TLDP IV 204.10 crs charged to P&L till Q3FY15. The details are as below:- Project FY2013-14 Q1 FY2014-15 Q2 FY2014-15 Q3 FY2014-15 Total Borrowi ng Cost Admin. & Other Cost Borrowing Cost Admin. & Other Cost Borrowing Cost Admin. & Other Cost Borrowing Cost Sub. Lower 766.90 341.54 101.88 35.91 102.65 41.51 102.25 TLDP IV 91.35 67.91 23.15 13.61 22.88 11.20 8.11 Admin. & Other Cost 35.15 -34.11 1527.79 204.10
View entire presentation