Investor Presentaiton
NHPC - Projects Under Construction
CCEA
एनएचपीसी
NHPC
Installed
Design
Estimated
Anticipated
NHPC Project
Capacity
Energy
Type of the
project
(MW)
(MU)
Cost (Rs.
Crore) (Price
Project Cost
(Rs. Crore)
Level)
TLDP IV (40x4) West
160
720
Run of River
1061.38
1929.15
* 1
Provisional
Project
Expenditure
till -Dec'14
(Rs. Crore)
1606.79
Expected
Commissioning
Schedule
FY 16-17 (Q-2)
Bengal
with small
(MAR05)
(AUG13)
pondage
Subansiri Lower
2000
7421
Reservoir
6285.33
15300.00
*27057.12
It shall be
(250X8) Assam/ Ar.
(DEC02)
(JAN14)
Pradesh
finalized after
resumption of
works
Parbati II (200x4)
800
3108.66
Run of River
3919.59
5365.70
4789.81
FY 18-19 (Q-4)
Himachal Pradesh
with small
(DEC01)
(AUG11)
pondage
Kishanganga (110x3)
Jammu & Kashmir
330
1350
Run of River
3642.06
5497.72
3799.79
FY 16-17 (Q-3)
with small
pondage
(SEP07)
(JUL13)
Total-A
3290
12599.66
14908.36
28092.57
17253.51
In case of Sub Lower1527.79 crs charged to P&L and in case of TLDP IV 204.10 crs charged to P&L till Q3FY15. The details are as below:-
Project
FY2013-14
Q1 FY2014-15
Q2 FY2014-15
Q3 FY2014-15
Total
Borrowi
ng Cost
Admin. &
Other Cost
Borrowing
Cost
Admin. &
Other Cost
Borrowing
Cost
Admin. &
Other Cost
Borrowing
Cost
Sub. Lower
766.90
341.54
101.88
35.91
102.65
41.51
102.25
TLDP IV
91.35
67.91
23.15
13.61
22.88
11.20
8.11
Admin. &
Other Cost
35.15
-34.11
1527.79
204.10View entire presentation