Investor Presentaiton
777 and Reed Mines
STEADY, LOW-COST PRODUCTION
•
Optimizing operations to end of mine life
Plan to keep processing assets on care and
maintenance after mine closures to maintain
regional optionality
HIDRAY
HUDBAY
777 & REED COMBINED
Ownership
20161
AVG. LOM²
100% / 70%³
Daily ore throughput
Annual Cu production4
Annual Zn production4
Annual Au-Eq. production4
Unit operating cost
Mine life6
4,800 tpd
4,200 tpd
35kt
27kt
40kt
49kt
51koz
67koz
C$88/t
C$88/t
3-4 years / 2 years
777 HEADFRAME
Source: Hudbay and VMS Venture Inc. company disclosure
1. Full year ended December 31, 2016.
REED MINE SITE
2. 777 LOM as per NI 43-101 Technical Report on 777 Mine dated October 15, 2012 incorporating years 2017 to 2019; Reed LOM as per NI 43-101 Pre-Feasibility Study Technical Report on the Reed Copper
Deposit dated April 2, 2012 as filed by VMS Ventures Inc., shown on 100% basis, 1,300 tpd operation. LOM average based on full years 2017 to 2019.
3. Reed is 70% owned by Hudbay.
4. Production is contained metal in concentrate; silver converted to gold at a rate of 70:1.
5. Combined mine, mill and G&A unit operating costs per tonne of ore processed. 2016 combined unit operating cost guidance for the entire Manitoba Business Unit is C$80-100/tonne.
6. Mine life as of January 1, 2017.
13View entire presentation