Vertically Integrated Global Bitcoin Mining Company Presentation slide image

Vertically Integrated Global Bitcoin Mining Company Presentation

SHERBROOKE, QUÉBEC • Hydro Power 3 farms in close proximity Contracted: Operating: - De la Pointe 96 MW 84 MW 18 MW1 - The Bunker 1 & 2 36 MW - Leger In Construction: 30 MW - The Bunker 3 - Garlock 12 MW 18 MW -P83- P84- • Retiring: (18 MW) 1 THE BUNKER Notes: As of August 15, 2022 1. De la Pointe reduced from 30 MW to 18 MW and is scheduled to be fully retired before February 2023 -P86- -P87- = 01010 LEGER GARLOCK Bitfarms™ 5