Massive Sulphide Project Overview
4.05 m: Ag 21.1 g/t;
Pb 2.12 %; Zn 1.79 %
5.7 m: Ag 136.9 g/t;
Pb 2.8%; Zn 0.83 %
4.4 m: Ag 48.9 g/t;
Pb 5.35 %; Zn 5.99 %
7m: Ag 22 g/t;
Pb 1.23 %, Zn 8.27%
2018 DRILLING: MAIN ZONE - EXTENSION TARGET
(PAD 6) Cross Section A-A' & Selected Drilling Results
ā 2018 drilling returned elevated Silver and Zinc
grades over substantial widths
True
Length
Au
Pb
Zn
Hole
Width
(m)
(m)
(g/t)
(%)
(%)
3į
Cu
Mn
(%)
(%)
YKDD18-012
13.00
9.19
150.6
8.09
18.04
0.05
3.67
Including
5.00
3.54
277.8
14.01
35.36
0.04
3.07
13m: Ag 150.6 g/t,
Pb 8.09%, Zn 18.04%
YKDD18-013
12.37
1.20
158.0
6.04
23.12
0.00
3.06
12.37m: Ag 158.04 g/t,
Pb 6.035%, Zn 23.12%
Including
5.65
3.24
207.5
7.43
40.24
0.06
1.76
And 0.80
0.46
322.0
15.60
47.38
0.02
0.28
YKDD18-014 22.00
0.85
22m: Ag 122.59 g/t;
122.6
7.33
10.97
0.22
2.00
Pb 7.33 %; Zn 10.97%
YKDD18-016
8.63
2.33
142.1
11.44
18.36
0.02
4.52
0
12.5 25
50
Including
2.00
1.03
272.0
22.94
31.29
0.14
1.17
Meters
*See press releases dated October 29, and November 20, 2018.
CANTEX
TSXV: CD
1:1,500
YKDD16-005
YKDD18-012
YKDD18-013
YKDD18-014
YKDD16-004
Legend
Collar
Zone
DDH Trace Drilled
DDH Trace Proposed
Fault
Surface
Overburden
Mafic Dyke
Alteration Zone
Mineralized Zone
Massive Dolomite
10View entire presentation