Investor Presentaiton slide image

Investor Presentaiton

TMT Project Area - Satellite-Deduced Hydrothermal Alteration Targets TMT PROJECT - Chile SAN JUAN ARGENTINA Tambo Sur IV Tambo Sur II Tambo Sur Ill bo Sur I Tambo Sur VI Tenement File number name TORO LOLA MALAMBO MALAMBO 2 LA SAL 2 MALAMBO 3 MALAMBO 4 TAMBO SUR TAMBO SUR I TAMBO SUR II TAMBO SUR III TAMBO SUR IV TAMBO SURV 1124-528-M2011 1124-181-M-2016 425-101-2001 1124-485-M-2019 134-D-2006 1124-074-2022 1124-073-2022 1124-188-R-2007 1124-421-2020 1124-420-2020 1124-422-2020 1124-299-2021 1124-577-2021 TAMBO SUR VI 1174-579-2021 Tambo Sur V Tambo Sur N MALAMBO 4 N 420000 E Tambo North 2 Tambo North 450000 E Tambo V Tambo South Malambo 4 Malambo 3 Malambo Lola Ranking A1 A2 A3 Toro North B1 B2 B3 Toro 10km - Figure 7: TMT project area, showing satellite- derived linear zones of iron-oxide - kaolinite - phyllic alteration (wavelength - 400m), ranked exploration targets and the metallogenic map for northwestern Argentina. Left hand image- Metallogenic map showing areas of exploration interest (IGRM / SegemAR, 2017). Right hand image Image showing linear alteration features (coloured by intensity from yellow to red) and coincident vectors. The map shows the TMT tenement outlines and the eleven targets of exploration interest, which are delineated and ranked on the basis of the satellite-deduced alteration results. The most apparent targets occur in Tambo South; Malambo; and Toro. Additional anomalies are recognized in Tambo V, Malambo 3 and 4, and Lola. A high-priority area lies adjacent to the southern boundary of Tambo VI. MALAMBO 3 6,780,000 N Tambo VI Malambo Malambo 2 San Juan province Toro Lola kilómetros 2.5 Note on target ranking: A-class targets are of higher priority than B-class targets. Within each target class, targets are prioritized from 1 (highest) to 3 (lowest). However, the sensitivity of the ranking method is coarse, such that there may not be a significant difference in the prospectivity of targets prioritized as 1 and 2 in each class (e.g. A1 > A2). 10 10
View entire presentation