Methanex Project Overview slide image

Methanex Project Overview

12 Methanex annual production capacity Plant New Zealand Annual operating capacity¹ (000s tonnes) 2,200 Current # of plants² Gas supply 3 Geismar³ 2,200 2 Trinidad (Mx share) 1,960 2 Chile 1,700 2 Multiple medium-to long-term physical contracts which include a base price and variable price component linked to methanol prices Physical contract, financial hedges and spot market Physical contract which includes a base price and variable price component linked to methanol prices Multiple short-to-medium term contracts which include a base price and variable price component linked to methanol prices Egypt (Mx share) 630 1 Medicine Hat 640 1 Long-term contract which includes a base price and variable price component linked to methanol prices Physical contract, physical hedges Total 9,330 11 Supply chain Asia Pacific North America and other major markets around the globe Asia and other major markets around the globe South America and other major markets around the globe Egypt and Europe Western Canada and US 1 Annual operating capacity reflects, among other things, average expected plant outages, turnarounds and average age of the facility's catalyst. Actual production for a facility in any given year may be higher or lower than operating capacity due to a number of factors, including natural gas composition or the age of the facility's catalyst. 2 Our Waitara Valley plant in New Zealand and Titan plant in Trinidad are currently idled due to natural gas availability. 3. Currently building our Geismar 3 methanol project (1.8M tonnes) with commercial operations targeted for late 2023/early 2024. methanex the power of agility
View entire presentation