Investor Presentaiton
Porphyry Project
Concept Study Outcomes
Initial Capital Cost Summary
Mine Development
Processing Plant and Infrastructure
Total
Operating Cost Summary
Tonnes of ore treated
Avg gold grade (g/t)
Avg copper grade (% Cu)
Contained gold ounces
Contained copper tonnes
MERDEKA
USD mn
Operating Statistics
332
Mining rate (ore tonnes per annum)
540
Copper Recovery %
872
Gold Recovery %
TC & RC
Value
Royalties
260,000,000
Copper %
0.8
Gold %
0.8
6,018,518
Operating Cost Summary
1,976,000
SLC Mining
2,734,112
Process Plant (Crushing to Concentrate)
Contained copper equivalent tonnes
.
•
•
Concept Study fully supports move to Pre-Feasibility Study
Pre-Feasibility Study
-
-
Infill drilling upgrade resource to Measured / Indicated
Hydrogeology, Geotechnical and Structural Geology
Mine planning
Metallurgy and Processing
Other infrastructure
Indonesia mining / smelting regulations
PT Merdeka Copper Gold Tbk.
COPPER GOLD
Value
12,000,000
85
70
$90/t and $0.10/lb
4.00
3.75
LOM (USD/t ore)
17.88
8.25
28View entire presentation