5. Addressing the Reform in the Power Sector
5.3 Overcapacity should be significantly reduced
•
Over capacity has increasingly become a
concerning issue
As much as 60% capacity is currently
unutilized (16 May 2021)
A plant wise analysis shows that majority of
plants remain idle as high as 100% in a
particular day (16 May 2021)
25000
20000
15000
10000
5000
Such inefficiency caused high capacity payment
to a large number of enterprises
This caused a rise in average unit price of
electricity as high as Tk.1500 per kwh
Such huge cost burden is increasingly getting
difficult for the BPDB to accommodate its loss
and force it to take loan from the government
BPDB is at present the highest recipient of
cash loan from the government.
.
BPDB should revise its generation plans for 2030
considering the revised slow rise in demand
0
Overcapacity Issue in the Power Sector
70.0
48.9
64.1
60.2
60.0
50.0
40.0
30.0
20.0
10.0
0.0
16/1/2018
16/2/2018
16/3/2018
16/4/2018
16/5/2018
16/6/2018
16/1/2019
16/2/2019
16/3/2019
16/4/2019
16/5/2019
16/6/2019
16/1/2020
16/1/2020
16/2/2020
100%
Installed Capacity
OZZ/S/9T
Peak Evening
16/4/2020
16/5/2020
16/6/2020
16/1/2021
16/2/2021
16/3/2021
16/4/2021
16/5/2021
Over capacity
Plant wise overcapacity (in %) on
16 May 2021
21
20
29
80%
38
48
51
66
67
72
71
60%
40%
20%
0%
Dhaka
Chattagram
Comilla
Mymensigh
Sylhet
Khulna
Barishal
Rajshahi
Rangpur
Total
■0 1--20 21-40 41-60 61-80 80-99 100