• ● ● ● 5. Addressing the Reform in the Power Sector 5.3 Overcapacity should be significantly reduced • Over capacity has increasingly become a concerning issue As much as 60% capacity is currently unutilized (16 May 2021) A plant wise analysis shows that majority of plants remain idle as high as 100% in a particular day (16 May 2021) 25000 20000 15000 10000 5000 Such inefficiency caused high capacity payment to a large number of enterprises This caused a rise in average unit price of electricity as high as Tk.1500 per kwh Such huge cost burden is increasingly getting difficult for the BPDB to accommodate its loss and force it to take loan from the government BPDB is at present the highest recipient of cash loan from the government. . BPDB should revise its generation plans for 2030 considering the revised slow rise in demand 0 Overcapacity Issue in the Power Sector 70.0 48.9 64.1 60.2 60.0 50.0 40.0 30.0 20.0 10.0 0.0 16/1/2018 16/2/2018 16/3/2018 16/4/2018 16/5/2018 16/6/2018 16/1/2019 16/2/2019 16/3/2019 16/4/2019 16/5/2019 16/6/2019 16/1/2020 16/1/2020 16/2/2020 100% Installed Capacity OZZ/S/9T Peak Evening 16/4/2020 16/5/2020 16/6/2020 16/1/2021 16/2/2021 16/3/2021 16/4/2021 16/5/2021 Over capacity Plant wise overcapacity (in %) on 16 May 2021 21 20 29 80% 38 48 51 66 67 72 71 60% 40% 20% 0% Dhaka Chattagram Comilla Mymensigh Sylhet Khulna Barishal Rajshahi Rangpur Total ■0 1--20 21-40 41-60 61-80 80-99 100 37
View entire presentation