Investor Presentaiton
Target 5 - Kobada West
Previously untested target unlocks newly identified structure <1km from pit
•
•
•
•
.
•
First ever drill holes at Kobada West
delineated continuous, near surface oxide
gold mineralisation with consistent grades
and thicknesses section-to-section
Kobada West is interpreted to lie on a parallel
structure less than 1km west of the Kobada
Main deposit
Structure is outside of the current Mineral
Resource
Drilling has identified shallow, oxide
mineralisation on every section over the
current strike length of 600 metres
Remains open along strike and at depth
Significant intersections include¹:
• 9m at 1.72g/t incl. 2m at 6.26g/t
1m at 11.3g/t and 5m at 1.26g/t
1290000mN
5km
°
545000mE
2023 Drilling
Resource outline
3003 Mineralisation outline
600m
Kobada West
Kobada Main
Kobada Shear
Kobada South
Deposit
ODD
ст
4.5km
8 8 8 8
8
axo co
Kobada North
2km
Gosso
550000mE
о
- 1293800mN
546200mE
2023 Drilling
Mineralisation outline
1293600mN
600m
546400mE
TOUBANI
RESOURCES
546600mE
546800mE
OPEN
/O KW22_P004
KW22 P003 O
KW1/22_P004
°
KW1/22 P003
о
KW1/22 P008
KW1/22 P007
о
-1293400mN
- 1293200mN
KW1/22_P011 O
OKW22 P002
KW22 P002
11m @0.55 g/t Au
2m @ 2.66 g/t Au
O KW22 P001
KW22 P003
5m @ 1.26 g/t Au
1m @ 11.3 g/t Au
O KW1/22 P001
KW1/22 P001
1m @ 5.50 g/t Au
KW1/22 P003
9m @ 1.72 g/t Au
Incl. 2m @ 6.26 g/t Au
KW1/22 P006
2m @ 0.51 g/t Au
2m @ 3.22 g/t Au
KW1/22 P006
KW1/22 P005
KW1/22 P005
5m @ 0.80 g/t Au
Incl. 1m @ 2.63 g/t Au
KW1/22 P009
5m @ 1.24 g/t Au
3m @ 0.93 g/t Au
O KW1/22 P009
KW1/22 P010
O KW1/22 P008
OPEN
0
Kobada West
200m
•
5m at 1.24g/t and 3m at 0.93g/t
• 11m at 0.55g/t, 2m at 2.66g/t and 3m at
1.12g/t
Note: 1 Refer to the Company's announcement dated 17 May 2023.
24View entire presentation