Investor Presentaiton slide image

Investor Presentaiton

POLYMETAL INTERNATIONAL PLC MAYSKOYE INVESTOR PRESENTATION 51 Pevek Mayskoye 2018 RESERVES JORC 2018 RESOURCES JORC Location Life of mine Mining Processing Product Strategy AMURSK POX 2.2 Moz GE at 6.9g/t 2.8 Moz GE at 11.4 g/t Chukotka, Russia 2034* (16 years) Underground (75%) / Open pit (25%) 850 Ktpa flotation concentrator/CIL Gold concentrate, activated carbon Production volumes are expected to improve by 10-15-% in 2019 (thanks to introduction of higher grade oxide ore and commissioning of a combined float-leach circuit) and will remain stable in mid term. Oxide ore treatment will re-commence in Q2 2019. Nakhodka Road Port HUB Water Route City/Town Open pit Underground Asset location PRODUCTION, GE Koz 138 2015 Notes: 6.7 116 124 117 + 5.3 5.9 2016 2017 2018 * Assuming reasonable resource-to-reserve conversion 7.1 Grade, g/t