Investor Presentaiton
POLYMETAL INTERNATIONAL PLC
MAYSKOYE
INVESTOR PRESENTATION
51
Pevek
Mayskoye
2018 RESERVES
JORC
2018 RESOURCES
JORC
Location
Life of mine
Mining
Processing
Product
Strategy
AMURSK POX
2.2 Moz GE at
6.9g/t
2.8 Moz GE at 11.4 g/t
Chukotka, Russia
2034* (16 years)
Underground (75%) / Open pit (25%)
850 Ktpa flotation concentrator/CIL
Gold concentrate, activated carbon
Production volumes are expected to
improve by 10-15-% in 2019 (thanks to
introduction of higher grade oxide ore and
commissioning of a combined float-leach circuit)
and will remain stable in mid term. Oxide ore
treatment will re-commence in Q2 2019.
Nakhodka
Road
Port
HUB
Water Route
City/Town
Open pit
Underground
Asset location
PRODUCTION, GE Koz
138
2015
Notes:
6.7
116
124
117
+
5.3
5.9
2016
2017
2018
* Assuming reasonable resource-to-reserve conversion
7.1
Grade, g/tView entire presentation