Investor Presentaiton slide image

Investor Presentaiton

Intrastate Natural Gas Pipeline Segment ~ 11,600 miles of intrastate pipelines with ~24 Bcf/d of throughput capacity, and ~88 Bcf/d of working storage capacity لسل ENERGY TRANSFER Intrastate Highlights Well-positioned to capture additional revenues from anticipated changes in natural gas supply and demand in the next five years Strategically taken steps to lock-in additional volumes under fee-based, long-term contracts with third-party customers Modernization and optimization work on the Oasis Pipeline is underway, which will add an incremental 60,000 Mcf/d of capacity out of the Permian Basin by the end of 2022 Evaluating Permian Basin takeaway project that would utilize Energy Transfer assets, along with a new build intrastate pipeline from the Midland Basin to Energy Transfer's extensive pipeline network south of Fort Worth, TX, to provide producers with firm capacity to premier markets along the Texas Gulf Coast, as well as throughout the U.S. Major Connect Hubs Pipeline Capacity (Bcf/d) Pipeline Storage (Miles) (Bcf/d) Bi- Directional Trans Pecos & Comanche Waha Header, 2.5 335 NA No Trail Pipelines Mexico Border ET Fuel Pipeline 5.2 3,150 11.2 Yes Asset Overview Trans Pecos/Comanche Trail ET Fuel Oasis Houston Pipeline Waha, Katy, Carthage Oasis Pipeline 2.0 750 NA Yes Waha, Katy HSC, Katy, Aqua Houston Pipeline System 5.3 3,920 52.5 No Dulce ETC Katy Pipeline 2.9 460 NA No Katy Katy RIGS 221 Union Power, LA 2.1 450 NA No Tech RIGS Red Bluff Express EOIT Storage Red Bluff Express 1.4 108 NA No Waha EOIT¹ 2.4 2,200 24.0 Yes OG&E, PSO 1. The EOIT pipeline system is has multidirectional flow capabilities between numerous receipt and delivery points, which limits our ability to determinate an overall system capacity. During the year-ended December 31, 2020, the peak daily throughput was 2.4 Bcf/d 31
View entire presentation