AngloAmerican Results Presentation Deck slide image

AngloAmerican Results Presentation Deck

Innovative technologies in development & roll-out Coarse Particle Recovery (CPR) Flotation process changed An enabler for hydraulic dewatered stacking Allows material to be crushed to larger particle size: • Throughput increase: +15% to +20% • 20% energy reduction per tonne¹ • Up to 85% water recovery with hydraulic dry stack Capital cost $10m to $150m El Soldado (Copper) • Full scale technology demonstration completed-handed over to operations Mogalakwena North (PGMs) • Construction complete • 100% of volume Slurry commissioning commenced Dec 2022 Quellaveco (Copper) • Commissioning expected late 2023 • Treatment of tailings Recoveries c. +3% over LOM ● 1. Total energy consumed remains the same, but CPR allows the throughput to increase, hence our energy efficiency improves, and energy consumed per tonne treated reduces. Anglo American ● SESE Next planned rollouts ● Coarse particle recovery unit Feasibility work continues at Los Bronces (Copper) & Minas-Rio (Iron Ore) Collahuasi-investigating options 87
View entire presentation