Investor Presentaiton slide image

Investor Presentaiton

4 CGNI adopted several preventive measures - both operational and financial - to prepare well for potential disruption in gas flows. Further reactive measures have been prepared which will be activated if needed. Operational preventive measures Principles for the state of emergency and related procedures and activities refreshed in all operational departments Daily determination of NG savings according to individual consumption levels Procedures for disconnection of large urban agglomerations from the point of view of future commissioning checked - GN's Emergency Committee manages in non-standard cases One-way SCADA communication introduced in preparation for possible cyber attacks, remote PRS commands blocked, network control in manual mode 6 Financial preventive measures Stress scenario analysis performed • Existing crisis and business continuity plans activated ● OPEX consumption delayed or reduced where reasonably possible • ● CAPEX CF delayed where reasonably possible Reactive gradual countermeasures applicable in case of emergency prepared (CAPEX, OPEX, Tax, Liquidity) Already strong financial position of the company with measures improve taken to strengthen it further: • • Decision of the shareholders to temporarily suspend dividend payments and interest on shareholder loans. Utilisation of CZK 500 mil. from Capex Facility under the new SFA gasnet.cz 22
View entire presentation