Perama Hill Project Overview slide image

Perama Hill Project Overview

Kışladağ Kışladağ is a low-grade, bulk-tonnage, open pit operation that uses heap leaching for gold recovery OVERVIEW Location Uşak Province, Türkiye Ownership 100% Mine type Open pit, heap leach Metals mined Gold Deposit type Processing method Gold porphyry Heap leach Black Sea RESERVES AND RESOURCES (2) Contained Tonnes Grade (x1000) (g/t Au) Ounces (x1000 Au) P&P Reserves 176,576 0.67 3,759 Ankara © M&I Resources 330,317 0.59 6,290 Inferred Resources 7,529 0.44 107 TÜRKIYE GREECE Kışladağ Life of mine 2022 Results 2023 Q3 YTD 13 years based on Reserves 135,801 ozs produced at $1,000/oz AISC(1) and C1 Cost (1) of $773/oz sold Production: 108,558 ozs Cash Operating Cost (C1)(1): $671/oz sold eldorado gold (1) (2) Mediterranean Sea Europe • Enhancing Efficiencies Kışladağ opportunity to increase throughput and recoveries beyond planned 56% Completed commissioning of the fine-ore agglomeration circuit, and is performing as expected; Upgraded materials handling and agglomeration systems These are non-IFRS financial measures or ratios. See Slide 2 'Non-IFRS Measures' for more information. Please refer to the Appendix for more information with respect to the mineral resources and mineral reserves. 19
View entire presentation