Investor Presentaiton slide image

Investor Presentaiton

Citra Palu Minerals (CPM) Gold Mine Project Overview Has rights to a 85.180 hectares mining concession in Central Sulawesi and South Sulawesi, Indonesia through a Contract of Work (Generation VI in 1997). Construction & Production permit was approved in Nov 2017 with 3 years construction period and 30 years production period (until 2050). 1st CIL gold Plant (500 ton /day) in Poboya Block-1 has been operational since Q1-2020. Completed the 2nd CIL gold plant construction (4,000 ton /day) in Q4 2022 (Production started in November 2022). Plan to complete the 3rd gold plant construction in 2024 (Rights Issue-1 / Prospectus dated 18 March 2021). Location PIT A (RIVER REEF) PIT B (HILL REEF 1) STOCKPILE Prospect Blok 1 - Poboya - Reserves/Cadangan Tonnage Grade Metal Content Classification Au Mton (g/t) Ag (g/t) Au (Oz) Ag (Oz) Proven 3.4 4.3 7.6 473,000 848,000 Probable 11.3 2.9 6.8 1,046,000 2,488,000 Sub Total 14.8 3.2 7.0 1,519,000 3,335,000 Proven Probable 7.9 0.9 2.5 238,000 638,000 Sub Total 7.9 0.9 2.5 238,000 638,000 Proven 0.07 1.5 3.3 3,000 8,000 Probable Sub Total 0.07 1.5 3.3 Total 22.8 2.4 5.4 3,000 1,761,000 8,000 3,981,000 Blok 1 - Poboya - Resources/Sumberdaya Tonnage Grade Metal Content Classification Au Ag Mton Au (Oz) Ag (Oz) (g/t) (g/t) Measured 3.4 4.3 7.6 473,000 RIVER REEF Indicated 12.8 2.8 6.5 1,134,400 848,000 2,648,800 Vein Inferred 3.1 2.9 5.1 287,400 507,100 Sub Total 19.3 3.1 6.4 1,894,900 4,004,000 Indicated 6.2 1.0 2.8 206,000 567,100 HILL REEF 1 Vein Inferred 0.3 0.7 1.5 5,800 12,400 BRMS's Gold Production Sub Total 6.5 1.0 2.8 211,800 579,500 FY 2020 73 Kg 2,271 oz FY 2021 139 Kg 4,328 oz FY 2022 1H 2023 174 Kg 236 Kg 5,415 oz 7,611 oz Indicated 2.4 0.7 1.5 52,100 116,300 HILL REEF 1 Stockwork Gneiss Inferred 0.2 0.7 2.2 5,200 16,300 Sub Total 2.6 0.7 1.5 57,300 132,600 Total 28.4 2.4 5.2 2,164,000 4,716,100 Gold Production Notes: Ndaru Cahyono (CPI-154) In 2022. ⚫ The KCMI standard Resource was completed by a Competent Person The KCMI standard Reserve was completed by a Consultant Competent Person Join Damanik (PERHAPI CP.130.12.2016) In 2022. * the values in this table have been reported to appropriate significant figures; therefore; there may be discrepancies in the totaled values Source: BRM. BRM 8
View entire presentation