Five-Year Plan and Financial Outlook
Project information 2/5
Project
Status*
Phase
PTTEP'S
Share
Partners
6M 2021 Average Sales Volume **
2021 Key Activities
(as of April 2021)
Gas (MMSCFD)
Liquid (KBPD)
Thailand and JDA
• Study to explore additional field potential
14 L22/43
OP
Production
100%
15 MTJDA
JOC
Production
50%
Petronas-Carigali
16
G9/43
OP
Exploration
100%
•
Prepare for decommissioning activities
50%
263
8
• Ensure gas deliverability level at DCQ***
.
Activity suspended
17
G1/61 (Erawan)
OP
Exploration
60%
MP G2 (Thailand) Limited
40%
18
G2/61 (Bongkot)
OP
Exploration
100%
Others SEA
OP
SK309 and SK311**
173
(except
6.4-80%
Production/
Block K**
SK309 and SK311**
17
1
Malaysia
Gumusut-
Kakap (GK)
Exploration
(varied by Varied by permits
permits)
25
Block H**
Block K**
25
in Block K)
142
TOTAL
31.24%
JV
2
Yadana
Production
25.5%
Chevron
28.26%
767
MOGE
15%
JV
Petronas-Carigali
40.91018%
3
Yetagun
Production
19.3178%
MOGE
20.4541%
Nippon Oil
19.3178%
Myanma Oil and
Zawtika
4
OP
Production
80%
Gas Enterprise
20%
340
(M9 & a part of M11)
(MOGE)
5
Myanmar M3
OP
Exploration
80%
MOECO
20%
6
Myanmar M11
OP
Exploration
100%
7
Myanmar MD-7
OP
Exploration
50%
TOTAL
50%
8
Myanmar MOGE 3
OP
Exploration
77.5%
Palang Sophon
MOECO
10%
10%
WinPreciousResources
2.5%
***
Status: OP PTTEP operatorship / JOC = PTTEP joint operatorship/ JV = PTTEP as Joint Venture Partner
Sales volume stated at 100% basis/ For Malaysia project, gross production is net off unitization
DCQ Daily Contractual Quantity
38
• Awarded as an operator for Erawan field (Contract 1, 2 and 3) under PSC (after
concession-end in 2022)
•
Preparing all transitional works including construction of facilities, staff
recruitment, Gas Sales Agreement, and related procurement activities, aiming
for successful transition and gas production as per commitment.
• Awarded as a sole operator under PSC (after concession-end in 2022/2023)
Drill appraisal and exploration wells
•
•
Installation new wellhead platforms and drill production wells
• Finalise Gas Sales Agreement and Prepare for seamless operation handover
⚫ SK309 and SK311: Pemanis Gas Development Topside Installation and South
Acis Satellite infill oil development drilling
• Block K: SNP Development Drilling
• Block H: Maximize production at plateau 270MMSCFD after first gas in
February 2021
• Drill 2nd production well
• New DCQ*** proposal and negotiation with PTT
• Suspended the production due to the feed gas was not sufficient for the
minimum threshold level
• Some activities are delayed and process under difficulty due to the political
situation and COVID-19 in Myanmar
• Waiting for approval of PSC Supplementary
• FEED & OE and survey activities
•
Gas Sales Agreement negotiation
Waiting for final termination document from MOGE
Leftover material transferring to MOGE in progress (slow progress due to
current situation in Myanmar)
• Termination process in progress
• Leftover material transferring to MOGE in progress (slow progress due to
current situation in Myanmar)
• Termination process in progress
• Leftover material transferring to MOGE in progress (slow progress due to
current situation in Myanmar)View entire presentation