Ikutahara Project 2022 Exploration Programs
Ikutahara Project
Ryuo Prospect - Significant Drill Intercepts
Au08/Ag24
Au 18/Ag42
76.35
Au$5/Ag99
JAPAN
GOLD
CORP.
80.00
Au0.4/Ag3.4
Drill Hole
IKDD21-001
From (m)
To (m)
Length (m)
Au (g/t)
Au 19/Ag43
Ag (g/t)
8150
60.60
65.50
4.90
12.1
33.0
Au 0.7/Ag 4.4
Au 53/Ag44 E
Au 0.3/Ag 24
Au46/457
Incl.
63.90
64.45
0.55
59.4
49.5
IKDD21-003
81.20
83.32
2.12
6.32
12.6
Au 1.9/Ag5.7
Incl.
81.95
82.25
0.30
14.75
27.8
A1/Ag12
Av 3.3/Ag45
IKDD21-004
42.55
42.75
0.20
2.8
14.4
Au8.5/Ag 76
Au 03/Ag 3.9
Au 15.4/A
And
88.50
88.80
0.30
1.2
23.9
Au7/Ag 3.6
Au 6.05/Ag 2.0
Au$.1/Ag37
Au 0.3/Ag 3.0
IKDD21-005
140.40
140.70
0.30
1.4
4.9
Au1/Ag44
As 2.0/Ag 293.0
And
176.05
176.35
0.30
1.2
2.1
Au 0.4/Ag 1.4
Au 0.8/Ag 9.5
IKDD21-006
72.15
72.35
0.2
5.0
36.9
Au 37.2/Ag 360.0
Au 1.1/Ag 18.2
Au 47/Ag 31.2
Au $3/Ag27
IKDD21-007
233.30
234.30
1.00
30.0
284.0
IKDD21-008
254.15
254.60
0.45
1,395.0
768.0
Au$.1/AgG.7
Au 2.1/Ag 16.9
0.2/Ag 2.5
IKDD21-009
360.40
364.00
3.60
3.0
22.3
Au 0.05/Ag.
Au 1.2/Ag 3.2
IKDD21-010
74.05
94.05
20.0
6.3
15.7
Aw27/Ag 6.8
14.1/Ag 48.4
Au 8.3/Ag 7.2
Au 18.1/Ag 11.5
Incl.
82.85
83.50
0.65
92.0
64.3
Incl.
83.15
83.50
0.35
140.0
97.5
IKDD21-011
127.50
128.20
0.70
1.7
1.4
IKDD21-010 Jinja
vein zone with
mineralized sample
intervals and assay
values in g/t for gold
(Au) and silver (Ag)
(79.40 94.95 m).
Au 0.2/Ag 1.2
Au 33/Ag93
Au 0.4/Ag 2.9
Au 2.2/Ag42
Au 16/Ag7
Au0.1/Ag8.7 M
Au 305/Ag 40.9
Au 0.4/Ag 2.0
Au 2.3/Ag7
Aub1/3g17
Au 0.3/Ag 3.1
14.30
AuG1/Ag1.
AuBR/Ag 3.4
M.M
TSXV: JG | OTCQB: JGLDF
11View entire presentation