Agnico Eagle COVID-19 and Operations Update slide image

Agnico Eagle COVID-19 and Operations Update

300m 2000 m 10m LaRonde Mine - Composite Longitudinal Section AGNICO EAGLE West Ellison Property Ellison Property Bousquet Property Bousquet LaRonde LaRonde Zone 5 Shaft No. 2 Shaft No. 1 Penna Shaft LaRonde Shaft No. 2 Level 9 Exploration Drift LaRonde Zone 11-3 OPEN West mine LaRonde 3 OPEN 2019 Mineral Reserve Outline of former pit 2019 Mineral Resource Mined-out Areas of interest OPEN Bousquet Property LaRonde Property Level 201 Exploration Drift Level 25 Exploration Drift Under construction Exploration Drift Level 215 Exploration Drift Zone 20N Au LaRondo Property Shaft No. 4 9.000 m Zone 20N LaRonde 1 LaRonde 2 Level 245 Zn Level 257 Level 278 Level 282 Depth 2,858m East mine LR-302-013 20N Zinc Deep Exploration Program Below 3,100 m LR-302-014A LR-314-015 LR-302-012 3,000 m South Zone LR-314-013 Underground mine workings ā— Significant current drill hole pierce points metres ā€¢ Previously released drill hole pierce points In 20N Zinc South Zone Coordinate System:UTM83-217 East Au Ag Cu Zn/True Width 2019 Mineral Reserve 2019 Mineral Resource Mined cut 100 m LR-302-013 3.1 git Au: 138 g/t Ag; 0.10 % Cu: 14.6 % Zn/2.9 m, LR-302-014A 1.6 g/t Au; 51 g/t Ag. 0.35% Cu; 11.2% Zn/2.8 m OPEN LR-302-012 8.4 g/t Au; 101 g/t Ag: 0.57% Cu; 13.3% Zn/2.8 m OPEN LR-314-015 2.5 g/t Au: 221 g/t Ag: 0.71% Cu; 11.9% Zn / 3.7 m LR-314-013 5.2 g/t Au: 111 g/t Ag: 0.91 % Cu; 1.2% Zn/5.7 m 1000 OPEN CIBC 24th Annual Western Institutional Investor Conference | 31
View entire presentation