Investor Presentaiton
Cerro Las Minitas
SouthernSilver
EXPLORATION CORP
Potential Economic Updates
The PEA has modelled robust annual average cashflow particularly in the first eight years of mine-life. New work will focus on increasing
free cash flow within the current model
Adding Additional Resources:
•
New resources added at North Felsite in 2023 to be
incorporated into the mine design. Other areas with
exploration potential include:
➤North Skarn
Down-dip extensions of the eastern deposits
Engineering Upgrades:
Higher payable subsets of the Mine Production Schedule to be
evaluated
• Modified sub-blocking routine
Capital Cost/Contingency Reduction:
•
Full vetting of the Cash-flow model has identified additional
cash saving opportunities
Process Flow-sheet - TC-RCS/Gold Metallurgy:
Gold is not included as a payable in the current processing
flowsheet; currently working to define gold payables
• New metallurgical results consolidates the process flow
sheet to reduce the TCS-RCS
Oxide mineralization:
Au-Ag-enriched oxide mineralization is not included in the
flowsheet and could be used to augment recovered gold
from the pyrite-arsenopyrite-concentrate
Ore-Sorting:
•
Positive initial test results suggest significant waste rejection
and retention of mineral value. Further work is required
www.southernsilverexploration.com
14
TSX-V: SSV OTCQX: SSVFFView entire presentation