Investor Presentaiton
INFRASTRUCTURE FOR THE FUTURE
SEMI REGULATED REVENUES (100% BASIS)
Victoria Power Networks ($m)
Public Lighting
New Connections
Special Reader Activities
Service Truck Activities
Recoverable Works
Specification and Design
Other
TOTAL
2020
2019
Variance
7.9
11.9
(4.0)
16.6
15.1
1.5
4.4
4.6
(0.2)
6.4
5.9
0.5
0.8
2.2
(1.4)
13.5
13.3
0.2
12.8
7.8
5.0
62.4
60.8
1.6
SA Power Networks ($m)
Public Lighting
Metering Services
Pole/Duct Rental
Other Negotiated Services (1)
TOTAL (2)
(1) Includes Asset Relocation and Embedded Generation
(2) Does not include Alternative Control Services (ACS) revenue, which is reported as part of DUOS revenue
Spark Infrastructure | Investor Presentation | February 2021
2020
2019
Variance
11.1
23.5
(12.4)
15.8
15.7
0.1
4.8
3.9
0.9
49.7
54.2
(4.5)
81.4
97.3
(15.9)
44View entire presentation