Investor Presentaiton
World-class project attributes
Brownfield pathway provides potential for substantial capital-efficiency benefits
AUGUST 2022
SCOPING STUDY OUTCOME
US$620M
Pre-production capital expenditure
for 1mtpa greenfield development
Pre-production capital development intensity
(US$ per tonne annual MOP production capacity)
1,310
704
620
560
OHMGEBIRGE
PERMITTING PROCESS
COMMENCED
REQUISITE PRELIMINARY
SCOPING PAPER SUBMITTED TO
KEY REGULATORY BODY (JUNE 2023)
BASED ON
DUAL POTENTIAL
DEVELOPMENT
PATHWAYS
Full Spatial Planning Application
to be submitted by Q4 CY23
based on a single elected
development pathway
SOUTHHARZ
POTASH
OPTION 1: BERNTERODE
Preferred brownfield option
utilising existing shaft
infrastructure offering potential
savings to overall CapEx and timing
Option 1.A: Bernterode shaft and Bernterode
railway station; or
Option 1.B: Bernterode shaft and Leinefelde
OPTION 2: HAYNRODE
Greenfield development pathway
with new shaft benefitting from
ready access to existing gas, rail
and road infrastructure
Option 2.A: Haynrode and Leinefelde; or
Option 2.B: Haynrode and Bernterode
railway station
EMMERSON PLC
SOUTHHARZ
POTASH
Highfield BHP
Resources
1. Refer ASX announcement 8 August 2022, South Harz confirms that it is not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical parameters underpinning that release
continue to apply and have not materially changed.
AUGUST 2023
INVESTOR PRESENTATION
7View entire presentation