Investor Presentaiton slide image

Investor Presentaiton

Marymia Project: Advanced Prospects 700,000 ME 0 20 kilometres NORTH TWO POOLS Successful initial RC drilling campaign completed in 2018 (5,196m) • MRC688 2m @ 3.48 g/t from 51m • MRC691 1m @ 16.29 g/t from 238m • MRC692 6m @ 1.87 g/t from 28m • MRC693 5m @ 1.91 g/t from 51m; and 8m @ 3.90 g/t from 83m (incl. 2m @ 30.18 g/t) MRC694 3m @ 2.90 g/t from 1m • MRC699 1m @ 4.18 g/t from 95m . MRC701 11m @ 5.29 g/t from 66m (incl. 3m @ 18.53 g/t) • MRC702 1m @ 3.28 g/t from 65m • MRC703 1m @ 3.49 g/t from 67m; and 12m @ 8.82 g/t from 79m (incl. 3m @ 33.85 g/t) MRC711 5m @ 1.22 g/t from 174m 7,200,000 MN + • Hermes 700,000 ME . DeGrussa 750,000 ME To Newman ⚫ Plutonic • Monty 750,000 mE • Trident 800,000 mE + 7,250,000 mN AIC Mines Limited Marynia Mining den MARYMIA NE Initial RC drilling completed in late 2018 (4,694m) MRC670 12m @ 1.63 g/t from 193 (incl. 8m @ 2.34 g/t) MRC678 13m @ 1.79 g/t from 84m (incl. 5m @ 4.37 g/t) • Thaduna + 7,200,000 mN 800,000 ME Projection: MGA Zone 50 (GDA 94) 7
View entire presentation