NEA Nuclear Energy Agency Shimane Nuclear Power Plants (I) OECD • In Japan, before the Fukushima accident, nuclear energy accounted for almost 30% of the total electricity from 47.5 GWe of capacity (30 BWRs and 24 PWRS). • The Shimane nuclear power station is located in Kashima-chou, Shimane Prefecture, and owned by the Chugoku Electric Power Company (The Chugoku EPCO) • The Chugoku EPCO has two Boiling Water Reactors. The ratio of nuclear power generation capacity is less than 10%. - Unit No. 1 of Shimane (460 MW): Operation in 1974 - Unit No. 2 of Shimane (820 MW): Operation in 1989 This unit No. 1 is the first "all-Japanese plant", whose design, manufacture and construction were conducted by The Chugoku EPCO and Hitachi LTD. OECD NEA Workshop on Project and Logistics Management, Paris, 11th March 2014 3