PTTEP Energy Project Overview
E&P Business | Africa
Algeria
Production
Bir Seba (WI 35%)
• Oil production consisting of block 433a, 416b
• Operated by PVEP (WI 40%)
• Production volume crude 16KBPD
Hassi Bir Rekaiz (WI 49%)
• HBR oil filed consisting of block 443a, 424a and 415ext
1st Oil in June 2022 and will start delivering sales volume in
Q4/2022.
• Operated by Groupment (WI 51%)
• Production volume crude 13KBPD
Angola
Development
Block 17/06 (WI 2.5%)
• FID in July 2022 for Begonia offshore oil field in the Lower
Congo Basin, estimated production capacity at 30KBPD.
• Operated by Total Energies (WI 30%)
Bir Seba
ALGERIA
Block 17/06
Production
Development
Hassi Bir Rekaiz
ANGOLA
26
MOZAMBIQUE
MZA1
PTTEP
Mozambique
Development
MZA1 (WI 8.5%)
• High quality reservoirs capable up to 200MMSCFD per well
• Construction phase for LNG facility with capacity 13.1
MTPA (2 trains).
. Currently under Force Majeure due to local security
situation
•
Operated by Total Energies (WI 26.5%)View entire presentation