Investor Presentaiton slide image

Investor Presentaiton

GRI/SASB Standard Disclosure Omissions Page Requirements omitted Reason Answer 129 > IF-EU-140a.2 IF-EU-140a.3 SASB Electric Utilities & Power Generators 2018: Coal ash management IF-EU-150a.1 IF-EU-150a.2 IF-EU-240a.1 Number of incidents of non-compliance associated with water quantity and/or quality permits, standards, and regulations Description of water management risks and discussion of strategies and practices to mitigate those risks Amount of coal combustion residuals (CCR) generated, percentage recycled Total number of coal combustion residual (CCR) impoundments, broken down by hazard potential classification and structural integrity assessment Average retail electric rate for (1) residential, (2) commercial, and (3) industrial customers Complete standard Not applicable Complete standard Not applicable SASB Electric Utilities & Power Generators 2018: Energy affordability Typical monthly electric bill for residential customers for IF-EU-240a.2 (1) 500 kWh and (2) 1,000 kWh of electricity delivered per month Complete standard IF-EU-240a.3 Number of residential customer electric disconnections for non-payment, percentage reconnected within 30 days Discussion of impact of external factors on customer IF-EU-240a.4 affordability of electricity, including the economic conditions of the service territory Complete standard Complete standard Not applicable IF-EU-420a.1 SASB Electric Utilities & Power Generators 2018: End-Use efficiency & demand Percentage of electric utility revenues from rate structures that (1) are decoupled and (2) contain a lost revenue adjustment mechanism (LRAM) Complete standard Not applicable IF-EU-420a.2 Percentage of electric load served by smart grid technology IF-EU-420a.3 Customer electricity savings from efficiency measures, by market Complete standard Complete standard IF-EU-540a.1 SASB Electric Utilities & Power Generators 2018: Nuclear safety & emergency management Total number of nuclear power units, broken down by U.S. Nuclear Regulatory Commission (NRC) Action Matrix Column Complete standard IF-EU-540a.2 Description of efforts to manage nuclear safety and emergency preparedness Complete standard Not applicable 2022 Integrated Sustainability Report > GRI and SASB Content Index Complete standard Not applicable Not applicable Not applicable Not applicable Not applicable Not applicable Not applicable, because AES does not operate coal generation. Not applicable, because AES does not operate coal generation. Not applicable, because AES does not operate in the distribution sector. Not applicable, because AES does not operate in the distribution sector. Not applicable, because AES does not operate in the distribution sector. Not applicable, because AES does not operate in the distribution sector. Not applicable to Brazilian electric utilities sector. Not applicable to Brazilian electric utilities sector. Not applicable to Brazilian electric utilities sector. Not applicable, because AES does not operate nuclear generation. Not applicable, because AES does not operate nuclear generation. aes Brasil
View entire presentation