INTRODUCTION TO BOROUGE 4 بروج 777 Borouge Scheduled to be completed in 2025 and designed to provide 1.4mt additional polyolefins capacity Fully Integrated into Borouge complex... ...Adjacent to Other Borouge Existing Plants Joint project between ADNOC and Borealis - FID signed in November 2021 and EPC phase ongoing Located within the Ruwais Industrial zone, adjacent to Borouge 1, 2 and 3 Access to competitive feedstock from ADNOC Gas Processing, located near the Borouge complex Comprises of a 1.5mt ethane cracker, two Borstar PE units and a XLPE unit Sources: Company Information 56 Corporate Presentation | April 2022 Borouge 3 Borouge 2 Borouge 1 Borouge 4 2022 Google PP5 INSPIRING TOMORROW