Investor Presentaiton
ANNUAL REPORT
P
Private Power and Infrastructure Board
ANNUAL REPORT
Private Power and Infrastructure Board
Private Sector Transmission Line Projects 2015" - (Transmission Line Policy) for facilitation of investors.
The Policy features shortened, simplified and well aligned procedures of international standards
coupled with a set of concessions and incentives through one window facilitation of PPIB.
The first ever private sector transmission line project which is also the first HVDC project in the energy
history of Pakistan was committed by the Private Sector under the Framework of CPEC. The +660 kV
Bipoler Matiari-Lahore HVDC Transmission Line Project is one of
the key projects in CPEC which will transmit 4,000 MW of
electricity from the new power generation projects located in the
southern region of Pakistan. This transmission facility will
primarily be utilized to transmit power generated from
indigenous Thar coal based power generation projects, thus
contributing in enhancing the share of indigenous fuel based
generation and saving significant amount of foreign exchange.
PPIB is playing vital role in private sector resources mobilization
for mega power generation and transmission infrastructure
projects, and Matiari-Lahore HVDC transmission project is one
such example. Most of the civil works of the Project, along with
installation of major equipment have been completed in the
POLICY FRAMEWORK FOR PRIVATE SECTOR
TRANSMISSION LINE PROJECTS, 2015
GOVERNMENT OF PAKISTAN
Converter Stations and Transmission Line. Material supply for the project has also been nearly
completed and the project is scheduled to start Commercial Operations by 1st March 2021. It is
anticipated that the project will further pave the way for implementation of future transmission line
projects through the private sector. In pursuit of the objectives of Transmission Line Policy, PPIB has
been endeavoring to implement transmission line projects and is fully geared up to process such
projects through private sector as soon as NTDC recommends a list of doable projects. Brief
background and salient features of Matiari-Lahore Transmission Line project are appended at
forthcoming.
Matiari-Lahore HVDC Transmission Line Project
工程名称:巴基斯坦默蒂亚里-拉合尔4660
kV直流输电项目默蒂亚里换流站工程
施工部位:直流场电容器塔值阻测试试
1802
当前日期:2020年03月08日
2020/03/08 16:29
The project is designed to have bi-pole HVDC technology, having two convertor stations, one each at
the end of Matiari (Interior Sindh) and Lahore, three repeater stations and two grounding electrode
stations. It is being developed by China Electric power equipment and Technology (CET), a subsidiary
of State Grid Corp of China (SGCC). The project will be delivered on a turnkey basis, under Build, Own,
Operate and Transfer (BOOT) program. After 25 years, the infrastructure will be handed over to NTDC to
own and operate. PPIB is processing this mega project of national importance under the provisions of
Transmission Line Policy 2015.
Salient features of project are as follows:
>
Project Company:
> Sponsors:
>
Location:
>
>
Project Cost:
>
Applicable Policy
Transmission Capacity:
Pak Matiari-Lahore Transmission
Company (Private Limited)
China Electric Power Equipment &
Technology Company Limited (CET)
Matiari to Lahore
4,000 MW
US$ 1,658.34 million
Transmission Line Policy 2015
Key milestones achieved
Issuance of LOI: 27.03.2017
Issuance of LOS: 04.08.2017
Signing of IA/TSA: 14.05.2018
FC Date:
27.02.2019
103
Current Status:
With consistent efforts of PPIB and support of relevent stakeholders, Financial Close of the project was
achieved by the project company on 27th February 2019. The construction activities at the Project site
are in full swing since 1st December 2018 and even with the outbreak of Novel Coronavirus epidemic
(COVID-19), the Project has achieved substantial overall progress of 86%. Project is all set to be
commercially operational by March 2021.
~
104View entire presentation