Investor Presentaiton slide image

Investor Presentaiton

ANNUAL REPORT P Private Power and Infrastructure Board ANNUAL REPORT Private Power and Infrastructure Board Private Sector Transmission Line Projects 2015" - (Transmission Line Policy) for facilitation of investors. The Policy features shortened, simplified and well aligned procedures of international standards coupled with a set of concessions and incentives through one window facilitation of PPIB. The first ever private sector transmission line project which is also the first HVDC project in the energy history of Pakistan was committed by the Private Sector under the Framework of CPEC. The +660 kV Bipoler Matiari-Lahore HVDC Transmission Line Project is one of the key projects in CPEC which will transmit 4,000 MW of electricity from the new power generation projects located in the southern region of Pakistan. This transmission facility will primarily be utilized to transmit power generated from indigenous Thar coal based power generation projects, thus contributing in enhancing the share of indigenous fuel based generation and saving significant amount of foreign exchange. PPIB is playing vital role in private sector resources mobilization for mega power generation and transmission infrastructure projects, and Matiari-Lahore HVDC transmission project is one such example. Most of the civil works of the Project, along with installation of major equipment have been completed in the POLICY FRAMEWORK FOR PRIVATE SECTOR TRANSMISSION LINE PROJECTS, 2015 GOVERNMENT OF PAKISTAN Converter Stations and Transmission Line. Material supply for the project has also been nearly completed and the project is scheduled to start Commercial Operations by 1st March 2021. It is anticipated that the project will further pave the way for implementation of future transmission line projects through the private sector. In pursuit of the objectives of Transmission Line Policy, PPIB has been endeavoring to implement transmission line projects and is fully geared up to process such projects through private sector as soon as NTDC recommends a list of doable projects. Brief background and salient features of Matiari-Lahore Transmission Line project are appended at forthcoming. Matiari-Lahore HVDC Transmission Line Project 工程名称:巴基斯坦默蒂亚里-拉合尔4660 kV直流输电项目默蒂亚里换流站工程 施工部位:直流场电容器塔值阻测试试 1802 当前日期:2020年03月08日 2020/03/08 16:29 The project is designed to have bi-pole HVDC technology, having two convertor stations, one each at the end of Matiari (Interior Sindh) and Lahore, three repeater stations and two grounding electrode stations. It is being developed by China Electric power equipment and Technology (CET), a subsidiary of State Grid Corp of China (SGCC). The project will be delivered on a turnkey basis, under Build, Own, Operate and Transfer (BOOT) program. After 25 years, the infrastructure will be handed over to NTDC to own and operate. PPIB is processing this mega project of national importance under the provisions of Transmission Line Policy 2015. Salient features of project are as follows: > Project Company: > Sponsors: > Location: > > Project Cost: > Applicable Policy Transmission Capacity: Pak Matiari-Lahore Transmission Company (Private Limited) China Electric Power Equipment & Technology Company Limited (CET) Matiari to Lahore 4,000 MW US$ 1,658.34 million Transmission Line Policy 2015 Key milestones achieved Issuance of LOI: 27.03.2017 Issuance of LOS: 04.08.2017 Signing of IA/TSA: 14.05.2018 FC Date: 27.02.2019 103 Current Status: With consistent efforts of PPIB and support of relevent stakeholders, Financial Close of the project was achieved by the project company on 27th February 2019. The construction activities at the Project site are in full swing since 1st December 2018 and even with the outbreak of Novel Coronavirus epidemic (COVID-19), the Project has achieved substantial overall progress of 86%. Project is all set to be commercially operational by March 2021. ~ 104
View entire presentation