Sierra Rutile Investor Presentation
Established Cashflow From Area 1
Established operation positioned to deliver value and support transition to Sembehun
Overview
▲ Over 50 years in operation and ~2,200 local employees/contractors.
▲ 2022 JORC reserves showed increase from 38.2Mt to 40.7Mt despite mining
depletion of 10.4Mt primarily due to new reserves totalling 9.2Mt at Pejebu and
Ndendemoia.
▲ Focused on maximising cashflows from existing operations and ensuring
operational continuity through to Sembehun commissioning.
Assets
▲ Four wet concentrator plants (WCPs) producing mineral concentrate with feed
capacity of 500-600tph.
▲ Mineral concentrate is processed in the mineral separation plant (MSP), which
includes a feed preparation plant and dry plant. The MSP has capacity to produce
175ktpa of rutile.
▲ Products are exported through Nitti Port facilities situated in the Area 1 mining lease.
▲ MSP and Area 1 infrastructure have minimal book value but would have substantial
replacement cost. These assets will be leveraged across Sembehun development.
Note: (1) Ore Reserve and Mineral Resource estimate as at 31 December 2022.
Sierra Rutile Investor Presentation | ASX: SRX
Location & Size
Sembehun deposits
Proposed mine
development
Freetown
Nitti Port
Gangama &
Taninahun
Mineral Separation Plant
Gbeni
Sierra Rutile
Legend
MAP AREA
Area 1 Deposits Tenure
Sembehun Deposits Tenure
Other Deposits Tenure
Inferred Resources
I Measured & Indicated Resource
Previous Mining
Rivers
Roads
Ndendemola
Pejebu
Gbeni (Southem extension),
Lanti
0
10
km
2454440
14View entire presentation