Investor Presentaiton slide image

Investor Presentaiton

NECHAKO GOLD PROJECT W E April Showing (Au. Ag. As, Zn, Pb) Creek lineament target 04 LEGEND Phase MRC drill hole No. NRC-30-03 Breccia dome <50 20-7 Basal **Fluid flow Photo Col Shear zone DOH KAPROD 20-7 B-la-py-polation pipe (alteration destructive) Dacitic Breccia 04 Sediments Fluid flow એ એક વાર તાક ક યા મ ત ક Iron Fm. Basalt April Pond 399.000 m Basalt Fluid reservoir Kluskus Road 18-4004 Tower Resources Ltd - TSX-V: TWR 5,913,000 mN 18-003 18-02 MC-Zone 5.912,500 mN 37. (Cu) Porphyry Kluskus FSR Greywacke, Felsic tuff UTM NAD83 Zona 10 250 metres Chutanli Lake Pluton Potassic alteration pipe Au-receptive sediments 5,912,000 mN Chert-pebble conglomerate Figure 1- Geological map of the bedrock surface beneath the glacial deposits. The geology was determined from the RC drill holes because outcrops are absent. Note the major, funnel-shaped alteration pipe extending southwest (upward) from the former hydrothermal fluid reservoir in the dacitic breccia across the basalt to and beyond the Au-receptive sediments. 11 14
View entire presentation