Investor Presentaiton
NECHAKO GOLD PROJECT
W
E
April Showing
(Au. Ag. As, Zn, Pb)
Creek lineament target
04
LEGEND
Phase MRC drill hole No. NRC-30-03
Breccia dome
<50
20-7
Basal
**Fluid flow
Photo Col
Shear zone
DOH KAPROD 20-7
B-la-py-polation pipe
(alteration destructive)
Dacitic Breccia
04
Sediments
Fluid flow
એ એક વાર તાક ક યા મ ત ક
Iron Fm.
Basalt
April Pond
399.000 m
Basalt
Fluid reservoir
Kluskus Road
18-4004
Tower Resources Ltd - TSX-V: TWR
5,913,000 mN
18-003
18-02
MC-Zone
5.912,500 mN
37.
(Cu)
Porphyry
Kluskus FSR
Greywacke,
Felsic tuff
UTM NAD83 Zona 10
250
metres
Chutanli Lake
Pluton
Potassic alteration pipe
Au-receptive sediments
5,912,000 mN
Chert-pebble
conglomerate
Figure 1- Geological map of the bedrock surface beneath the glacial deposits. The geology was determined from the RC
drill holes because outcrops are absent. Note the major, funnel-shaped alteration pipe extending southwest (upward) from the
former hydrothermal fluid reservoir in the dacitic breccia across the basalt to and beyond the Au-receptive sediments.
11
14View entire presentation