Investor Presentaiton slide image

Investor Presentaiton

WHAT HAPPENED Description of the events presented in chronological order to highlight the integrated response to a multi-unit accident N 0 200 km 11 Mar 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 12 Mar 00:00 Higashidori NPP 01:00 02:00 03:00 04:00 05:00 Epicentre Onagawa NPP 06:00 07:00 Fukushima Daiichi NPP Fukushima Daini NPP Tokai Daini NPP Tokyo 08:00 09:00 10:00 Japan Trench 11:00 12:00 JAPAN Osaka 13:00 14:00 15:00 Confinement Control of reactivity Core heat removal AC power Critical support Spent fuel systems* pool cooling 15:36 Second tsunami wave starts 123456 12 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 flooding site (estimated inundation height OP+14.5 m) O cooling 15:42 Station blackout declared for Units 1-5 16:36 Presumed severe accident conditions in Units 1 and 2, - classification of a nuclear Bemergency 19:03 Declaration of a nuclear emergency by the national Government (16:03) RCIC à condensate storage tank 20:50 Fukushima Prefecture issues an evacuation order for an area of 2 km radius around the NPP 21:23 National Government issues an evacuation order for an area of 3 km radius and a sheltering order for a 10 km radius around the NPP 23:50 Unit 1 primary containment vessel exceeds maximum design pressure 01:40 Safety relief valve opens in - Unit 5 02:45 Unit 1 reaches maximum containment pressure 04:00 Increased radiation levels at main gate, start of alternate water injection into Unit 1 (first batch) 04:55 Confirmation and notification that dose rate at main gate increased cooling or make-up or make-up O cooling or make-up No cooling or make-up, (15:50) No indication for water level and temperature Not applicable 11:36 Loss of reactor core isolation cooling system (RCIC) in Unit 3 and automatic switch to emergency cooling 12:35 Automatic actuation of emergency cooling in Unit 3 to high pressure core injection system (HPCI) 14:00 Operators open venting line of Unit 1 and receive confirmation of venting at 14:30 15:30 Establishment of temporary seawater injection line to Unit 1 and power lines to Units 1 and 2 with high voltage power supply trucks 15:36 Explosion in Unit 1: destruction of water and power provisions, degrading site radiological conditions * Includes DC power and instrument air 1-6 Fukushima Daiichi NPP units (15:50) Loss of DC power through flooding (21:19) Portable batteries (15:50) Loss of DC power through flooding (20:47) Portable generator (15:50) Loss of DC power through flooding (21:27) Portable batteries (15:36) Two emergency diesel generators (EDGS) trip, one remains operational▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬ No cooling or make-up, (15:50) No indication for water level and temperature No cooling or make-up, (15:50) No indication for water level and temperature▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬ (15:37) Emergen (15:41) Emergency diesel generators trip causing a station blackout in) Primary containmen secondary containment (reactor building) m(15:38) Emergency diesel generators trip causing a station blackout (15:38) Emergency diesel generators trip causing a station blackout (15:40) Emergency diesel generators trip causing a station blackout t vessel cover open, only secondary containment esel generators trip causing a station blackout▬▬▬▬▬ ((08:13) Connection to Unit 6 EDG (for certain equipment) damages some equipment in support of low pressure core cooling Primary containment vessel exceeds maximum design pressure▬▬▬▬▬▬▬▬Venting cooling sytem (RCIC) from condensate storage tank (06:06) Head vent nozzle is opened 5:00) RCIC from suppression chamber HPCI 16:00 Izu-Bonin Trench Source: Esri, NASA Available Onerating Limited or partially available/operating Not available Alternative measure 05:44 National Government issues an evacuation order for an area of 10 km radius around the NPP 09:20 Continuous fresh water (FW) injection by fire engine into Unit 1
View entire presentation