Investor Presentaiton slide image

Investor Presentaiton

• • • Lihir Deep Sea Tailings Placement Rigorous baseline studies prior to approval DSTP approved as the preferred tailings management option from an environmental and social point of view for Lihir which has limited space for terrestrial tailings storage and is a seismically active region Ongoing monitoring of DSTP under a government approved Environmental Management and Monitoring Plan (EMMP) Lihir Environmental Management System certified to ISO14001:2015 Detailed seabed and tailings footprint surveys every five years as per EMMP requirements Periodic specialist technical reviews to assess DSTP system functioning as designed and develop ongoing research projects Tailings pipeline Mix-de-aeration tank Seawater intake pipe 0m- MLD Mixed layer depth 20- 20 Outfall pipeline 40- Mean MLD&EZD (50 m) 60- EZD Euphotic (photosynthesis) zone depth 80- 100- Outfall terminus 120- -120 m 140- Tailings travel as a density current to depths 160- >1000 m Deep ocean >1000 m 26
View entire presentation