Investor Presentaiton slide image

Investor Presentaiton

Pipeline capacity increase 2010-2016 Increase in capacity of pipeline systems (mbod) 1.446 1.288 1.168 1.747 1.765 1.765 1.765 1.765 1.765 2012 2013 2014 2015 2016 2017 2018 2019 2020 2011 2013 . Key Projects Source: Ecopetrol • Ocensa (Seg. III): from 340 to 400 mbod • ODC: from 180 to 240 mbod • Bicentenario: phase 1: 140, Phase 2: 240, Phase 3: 450 mbod • Magdalena Medio: from 52 to 100 and then to 140 mbod • Caño Limón: from 110 to 220 mbod ⚫OTA: From 45 to 85 mbod 2015-2020 . Pipeline to Pacific Ocean: 0 to 450 mbod 60 Years 44
View entire presentation