Farukhnagar & Mumbai Hub - Case Study
Farukhnagar Hub
Particulars
Before
After
Before
Mumbai Hub
GATI
After
I
Space (in sq ft)
84,000 Sq ft in 3 different
warehouses
1,13,000 Sq ft at a single
location
1,11,000 Sq ft in 3 different
warehouses
1,15,000 Sq ft at a single
location
I
Bays
56
89
27
|
I
I
I
61
I
Vehicle Loading Time
4 hour+
Less than 3 hours
4 hour+
Less than 3 hours
|
Productivity per head
5.7 tons
8+ tons
5.7 tons
8+ tons
Infrastructure
Amplification
leading to
Operational
Efficiencies
Farukhnagar Hub
Mega hub at Farukhnagar is a testament to our
infrastructure amplification strategy
The hub is well equipped for effective loading and
unloading leading to improved turnaround time
Load factor has increased by over 60% in the last one
year
•
•
Mumbai Hub
The Mega hub at Bhiwandi is operational and we are
witnessing improvement in operational parameters
Load factor has increased by over 40% in the last 2
months
The hub has a 61 docks & Dock Leveler with Scanning
Process