Enhancement of Production Platform
Capex drives output growth and improvements in efficiency
Main Goals
Increase steel production
•
Quality improvements
•
Fast growth of HVA products
Efficiency gains
Pre-painting line No.3
(200,000 t)
Blast furnace No.7
(3.4 m t)
Pulverized coal
injection (PCI)
Cold-rolling mills
(110,000 t x 2)
Cold-rolling mill
(350,000 t)
Vacuum degasser
Galvanizing line No.4
(300,000 t)
2 Ladle furnaces
60% energy self-
sufficiency
Pelletizing plant
(3.0 m tpy)
EAF steel & flats
(1.5 m tpy)
2011E
11.7 m t
BF No.4 revamp
Pelletizing plant
(6 m tpy)
Zhernovskoe-1
(3 m t of coking coal)
2012-15E
16 m t
6.9 m t 2,3
2 Ladle furnaces
2008E
9.4 m t
5.3 m t³
3
2010E
5.8 m t 3
2009E
11.3 m t
3
5.4 m t
9.5 m t
5.3 m t
1. Excluding Maxi-Group and raw materials assets capex
2. Numbers for the main production site
23
3. Projected production capacity by the end of 2015
Crude steel production
Flat steel production²